22 Kw Generac Backup Generator complete Installation video with 200 Amps Automatic Transfer Switch

preview_player
Показать описание
2021 Model 22 kw Generac standby Generator with 200 amps automatic Transfer switch complete installation video!
Рекомендации по теме
Комментарии
Автор

WOULD HAVE BEEN MUCH MORE HELPFUL WITH NARRATION INSTEAD OF THE MUSIC.

michaelkenny
Автор

Constant music is annoying. Can't hear what is being said.

nogeek
Автор

Another install where the main panel becomes a sub because the ats becomes the means of first disconnect therefore the panel needs to be feed with 4 conductors and grounds and neutrals need to be separated it's the same rule in the states as Canada

wizardz
Автор

You could probably make it affordable if you did it in stages. Electrical one year, gas the second year, generator the third year, otherwise it would be a mortgage.

danchesney
Автор

Looks like they’re missing a ground wire on the main breaker panel now that’s considered a subpanel?

edwardcudeyro
Автор

Excellent work guys keep up greeting from Orange City Florida Bes safe 🙏
🤓👋

carlosberrioselectrician
Автор

Something you don't see in the advertising, you basically have to have two major services reinstalled, & then you have the generator on top of that. And what a mess having all that hanging off the side of building. Integrating it into a new build would probably be the only way to make it worth while, otherwise the cost has got to be prohibitive.

danchesney
Автор

Where do you get the wall pipe brackets from those are different than I've ever seen

trackerify
Автор

Que calibre usaste desde el generador hasta el Transfer?

byzyeyw
Автор

What is this supposed to do??? Not interested in watching you do something that isn't explained.

ericperkins
Автор

Umm nice install but if that control board goes out you have made an easy job harder by not running your neutrals above and back down I install generac in the us and I wish our transfer switches had that much room

johndunham
Автор

I watched your video from 2015, and now this video from 2021. In over half a decade you guys have not changed! Still quite unprofessional. Can't even pour a proper concret slab. Can't even put the cables/lives lower to the ground to be less of an eye-sore. Driving the car onto the grass with no protection of the grass. The list can go on and on. The worst is I didn't even mention price, but it should go without saying that you're overpricing for your poor craftsmanship.

SummerSausage
Автор

De donde sacas ese código que pusiste dime por favor

nelsonmarquina
Автор

I notice that the transfer switch comes bonded (Neutral-gnd) as shown by the green wire connecting the box/gnd to N. I am just learning installs and I was told to remove that wire as it is not bonded there but in the main panel that the xfer switch feeds. Any comments?

jerrysmith
Автор

Is that meter too high? In Phoenix the max is 6ft 6in

sparkydon
Автор

Have had for 3 years and once again when the power outage happened the K22 didn't work. Says i need a repair person. Paying 8 Grand for something that is supposed to work occasionally, does not work. My comments have nothing to do with the contractors in this ad. Just lost my husband and can't afford another $400 "service call".

paulanelson
Автор

I am super jealous of this setup! What was the cost of the generator + installation?

robl
Автор

No issue with clearance to the gas regulator? Did you use a gas flex connector or steel pipe all the way?

TedM
Автор

Where is the 2 inch bushings on the PVC pipe are they missing?

edwardcudeyro
Автор

So what is the diagram for the generator on the grounding, bonding.. do I need to remove the green screw in the 40 space breaker panel as it's the secondary? Also, whatvis the diagram for the wires from the ATS to the generstor

japmlp