Force Transfer Around Openings

preview_player
Показать описание
More versatility, because the FTAO method allows for the use of narrower wall segments while meeting required height-to-width ratios, and
A high likelihood that fewer hold-downs will be required.
Engineering is cool.

#construction #engineering #building #framing
Рекомендации по теме
Комментарии
Автор

What nails do you use in your high pressure max framing gun? I keep getting wire caught in the plunger

randyfarmer
Автор

I admit I NEVER saw a detail like this before... but engineers do spec some strange details. I still don't see the need😮

jerwallzz
Автор

I think that'd be the spot where I'd add more tape.

landonlandon
Автор

Is that a cordless joist hanger nailer?

rosssanchez
Автор

Is there an advantage to putting on the seam tape first, or a disadvantage to putting on two layers, or after the strap?

Just seams (lol) like it's asking for trouble to put 200 perforations in a piece of tape.

deadfisher
Автор

Does it interfere with finish materials?

nicholasjohn
Автор

Does someone need to go to college and get a degree to do things how you do them? I feel like the likelihood of someone finding a mentor like yourself is slim.

larperator