I went through a huge distribution center currently under construction and it has some cutting edge technology inside.

The concrete, specifically, is a system done overseas but seldom in North America.

The original warehouse ground slab design was 8” @ 25kg steel fiber in non racked areas and 8” @ 30kg steel fiber in racked areas. Flatness specification was Fmin 60 to support Very Narrow Aisle (VNA) fork lifts. The concrete company were able to value engineer the slab design to a wide bay Jointless slab @ 6” @ 25Kg performance steel fiber in all areas with a flatness requirement FF 75 FL 50. That design change saved 63 Tons of steel fiber, 1500m3 of concrete and almost 13km of saw cuts and the resultant joint fillers.

I have a longer video coming out shortly!

⚡ Subscribe:

🙋‍♂️ Chad Griffiths, MBA, SIOR

#shorts #concrete #warehouse
Рекомендации по теме
Комментарии
Автор

The concrete system in here is very cool. Will have a longer video coming out on it shortly

industrialize
Автор

The sunglasses scream safety, seems legit.

BevBee
Автор

I've never been so excited about concrete!

BoBarronCCIM
Автор

Love the safety glasses. Where did you get them?

RealFindsPod
Автор

I love the consumer ceiling fans like their gonna do anything spaced that far away on a 40 ft ceiling. It really makes me wonder who the hell looks at a building that size and legitimately thinks yeah 3 bedroom sized ceiling fans gonna really cool this 400, 000 sqft building

Big-lron