Indian Defence Updates : Tejas MK2 Engine Change,800 Km Brahmos-A,Uttam Mk2 on Mig-29K,80 C-390 Deal

preview_player
Показать описание
Top 13 Latest Indian Defence News Headlines on today’s “Indian Defence Updates” episode 2-8-2024 are as follows :

🔴 FAST HEADLINES :
1. First Tejas MK1A delivery in November highly unlikely – Media Report
2. HAL was aware of potential engine delays for Tejas MK1A program
3. Ideaforge developing two Tactical uav’s
4. Army seeks to enhance Zorawar Protection but might add weight
5. More Indian 125mm HE rounds in Action in Ukraine
6. Pakistan’s financial crisis grounds F-16 spare supplies
7. Made-in-India 'Atal Gen2' pist-ol from Karnataka based Astr Defence
8. Indian Army conduct integrated Infantry & Armour training exercise

🔴 DETAILED HEADLINES :
9. HAL to leverage ADA data for #tejasmk2 engine Flexibility : Tejas MK2 potential engine change in the future
10. ADA seeks propulsion expert for AMCA TEDBF & #kaveriengine integration.
11. Brahmos Aerospace starts Extended range #brahmosmissile
12. Mig-29K fleet to get Uttam Mk2 FCR from Tejas MK2 program
13. Embraer hopes to sign contract with India in next 2-4 years

🔴 Connect with #IndianDefenceUpdates
⚪Instagram ► defencealerts
⚪Facebook ► defencealerts
⚪Twitter ► defencealerts

🔴 About : Indian Defence Updates is India's Top English Defence Channel. Indian Defence Updates brings you the latest daily updates related to Indian defence and latest technology news of Indian Army, Indian Air force, Indian Navy.

indian defence news,indian defence news headlines,indian defence news latest, indian defence latest news, defence updates latest,defence updates india,indian defence updates latest,indian defence updates 2024,defence updates 2024,indian defence updates india,indian defence update,best defence channel,best defence channel,indian defence updates
Рекомендации по теме
Комментарии
Автор

What's Your Opinion : "Tejas MK2 potential engine change in the future" ?
LIKE | COMMENT | SHARE | SUBSCRIBE

IndianDefenceUpdates
Автор

Its surprising that so far no Alien race has submitted their bid for MRFA or an engine.

main_stream_media_is_a_joke
Автор

Only the Indian Navy really supports indegenization.

cgtim
Автор

Our all hopes for Kaveri Engine. It's the permanent solution.

dhrubachakrabarty
Автор

Fed up of the mk1 mk2 just uploaded in the news when they're fully functional

imjonglepa
Автор

If an update to the Tejas MK1 is having this many delays, imagine when we'll really get AMCA. Sigh. I'm warming to the idea of at least a few squadrons of Su-57m to bridge the gap with our Su-30 production lines converted to it. There will be a lot of commonality with the Su-30MKI upgrade program where we can use cutting edge jammers replacing the Russian ones etc.

tipoomaster
Автор

The Indian army hopefully will not end up ordering Type 15 from China.

MrRonnymangang
Автор

Atal Gen2 looks like a great pistol iv never known India to make a good pistol this one might end up on Call Of Duty

braddbradd
Автор

I fail to understand why army needs both, armour and active protection? It's supposed to be light agile nimble and active protection with current armour should be enough to ask from special role tank..

nikunjthakkar
Автор

India with foreign products ✅🗿
India with indigenous products 🤡

DogeshsinghKhandu
Автор

ஆல் தி பெஸ்ட் இந்தியன் கவர்மெண்ட் ஆப் நியூ அப்டேட் தேஜஸ் எம் கே 2 அமுக்கா 5th ஜெனரேஷன் ஜெட் அக்னி6 அக்னி 7 இதைப் பற்றி முழு விவரத்துடன் செய்தி போடவும் ஆல் தி பெஸ்ட் டி ஆர் டி ஓ விஞ்ஞானிகளுக்கு வாழ்த்துக்கள் பாரத் மாதா கி ஜெய் 👍🏻👍🏻👍🏻👍🏻👍🏻🌹

durairaj
Автор

Don't trust HAL encarage private sector compatition is a must then only we will get results

ThulaaiDaran
Автор

If HAL was aware of future engine delays, why was there no contingency plan to ensure that there is no delay in the delivery of Tejas MK1A? This is no doubt a big mistake and the Defense Ministry should hold HAL accountable and seek answers as to why this happened.

artichokie
Автор

Muje lagta he tejas me kaveri lagega ab thoda jyada time jayega but kaveri k sath hi tejas mk2 aayega ab

hirensoni
Автор

The Army frequently changes its requirements. Initially, they send their specifications, then they add more armor or weight for weapons, and later claim the engine is underpowered and the tank isn't performing well, leading to demands for foreign platforms.

It's disappointing to see the Army procurement and planning committees operate this way—they should learn from the Navy.

The Air Force is even worse; after 22 years, they still can't decide on the type or model of aircraft that meets the country's needs. MRCA, MMRCA, or MRCA 2.0—whatever you call it.

devangprajapati
Автор

Indian army never satisfied with local weopans

sradhandas
Автор

Can PMO directly involve in the status of GTRE Kaveri engine testing and development as utmost priority? Having a reliable 75-80KN engine can not only save a lot of money but also helps its Airforce to get the fighter jets numbers it badly needs!!

realpennywise
Автор

India needs 50 fighter jet production in a year. WW3 starts from 2028. We are lagging behind.

Jai-Bharat
Автор

HAL has literally destroyed Tejas MK2 project with delays and engines from GE. Indian Govt should now atleast procure new jets from G2G deal so that HAL can remodify Tejas MK2 in next 10-20 yrs

jaurihar
Автор

Scrap hal Tejas mk1, mk1a mk2
Buy saab gripen or f16 in large number under mrfa with full TOT for manufacturing technique
Join tempest /GCAP for six hen tech
Use those in amca & tebdf

JohnnyFast-burj