Initial/Routine Lateral Test

preview_player
Показать описание
Initial/Routine Lateral Test #civil #engineering

Hi, thanks for watching our video
In this video we’ll walk you through:

Initial/Routine test shall be one-half percent to two percent of total number of piles or as specified, applicable to vertical and lateral load. Load Test shall generally conform to provision made in IS 2911 (Part IV) which provides guidelines for determination of safe loads and conducting of different types of tests.
Initial Test –Carried out on test piles to estimate the allowable load, or to predict the settlement at working load. • Routine test- Carried out as a check on working piles and to assess the displacement corresponding to the working load.

ABOUT OUR CHANNEL
Our channel is about to learn concepts of Civil Engineering. We cover lots of cool stuff such as Structure, Highway, Surveyor, Quality & Control and Consultant.
Check out our channel here:
Don’t forget to subscribe!

CHECK OUT OUR OTHER VIDEOS

FIND US AT

GET IN TOUCH
WhatsApp: 8745885050

FOLLOW US ON SOCIAL
Get updates or reach out to Get updates on our Social Media Profiles!

Рекомендации по теме
Комментарии
Автор

Proud to be a part of Geo Engineering Services 😀

rahulandani