How To Make And Fit Lead Step Flashing

preview_player
Показать описание
In this video I demonstrate how to make and install lead step flashings from code 4 sheet lead.
Complete step by step guide.
I hope you enjoy.
Рекомендации по теме
Комментарии
Автор

No one in the US does it like this. Instead they use 14 pieces and step over one another. It obviously works, but the issue is water, etc get into each of the steps and its 14 points to fail. The way you do it is absolutely superb, problems are eliminated! So well done!!!

SilverCymbal
Автор

Really nice to see you back at work and looking after your back by using a bench at elbow height and not bending over. Keep the videos coming. Best regards.

multirole
Автор

I just found your channel. Great content. There is a need for some good quality lead videos like this. I learned some great tips watching this one.

youdy
Автор

Thank you from PA, USA. Always love watching a craftsman!
Jeff

jeffdeluca
Автор

Great to see you back Stuart.How are you.all the best

jimmyadams
Автор

Am I wrong but can you bend the lead 90°and have it laying on top of the tiles??, very nice clean tidy job

paulperrin
Автор

Hi Stuart. Did you set the soakers in or did the roofers when they tiled?

Simon__Davies
Автор

I use a old wood chisel for clips still get the odd blown brick, nice job mate😊

MarkSmith-jtyj
Автор

For someone who is just starting out doing this would you recommend doing shorter lengths each time? Like maybe 1M instead of 1.5M?

officialnucky
Автор

Lovely job.What are those tiles called?

richardjones
Автор

Always wondered how this was done, many thanks for sharing your knowledge - subbed Just one question, couldn't see any headers so assume cavity, if so what about cavity trays and weeps?

nonegiven
Автор

I use a hammer thru flat headed screwdriver, as you say you will blow some brick on the tighter joints with the bolster

rbbuildsandleisure
Автор

Isn't the lead supposed to have excess that hangs/sits on top of the tile to prevent leaks at the seam where the tile meets the wall?

jibify
Автор

Why 80mm waterline, is that tge brick height? Thanks

MONKEY-vihx
Автор

Didn’t get to see how you did the overlapping.

tomalley
Автор

I always thought the length of code 4 shouldn't exceed 1200 mm.

PeakyBlinder
Автор

Why not just fit the lead in the right place at the eaves?
Saves waste, lead is expensive after all.

craigsimons
Автор

Cast lead is the banana lead, it's terrible.

PeakyBlinder