Air Handler Install 3D (AC / Heat Pump)

preview_player
Показать описание

Before you leave the shop, ensure that you have the proper equipment, tools, and supplies. The model number needs to match the one on the proposal, and you need to make sure that you have all of your duct fabrication materials.

When you arrive at the job site, recover the refrigerant from the old system. Purge hoses and weigh out the charge. Close the refrigerant lines once you’ve finished. Ensure that you have proper eye protection and that you wear a respirator when working in contaminated areas or are cutting duct board. Lay down drop cloths and make sure you have a means of disposing of garbage responsibly.

Before you remove the old equipment, the circuit breaker should be off, and you need to test each leg of power to ground. Clean and cut the copper tubing. Cut the drain with PVC cutters and disconnect all of your low-voltage control wires. Use a level and mark the duct board where it needs to be cut to get the squarest possible cut. Once everything has been cut and disconnected, you may remove the unit. Since the line set is open, now would be a good time to flush the copper tubing. We often replace the return box, and we replace wooden duct board supports with metal studs.

To cut duct board properly, you need to account for the thickness of your duct and understand how the tools work. As such, be sure to measure the inside dimensions when planning and making your cuts. Once you’ve made your cuts, you can assemble the box. Once you’ve got the box assembled, tape it at the edge where it all comes together with silver tape. Use alcohol to clean the duct surface, if necessary, and use a tape squeegee to get the best possible connection. Then, go over the silver tape with fab tape and use an outward-cinching staple gun on the taped surface. With the duct assembled, you can make your endcaps with plenty of overlap. Once the duct and endcaps have been put together, you can apply mastic over the joints.

Extend the new copper and PVC through the platform. Then, seal the chase. Once the PVC and copper are in place, you can assemble the plywood platform. The plywood should have openings for the unit and the copper and PVC. To assemble the platform, you would put the return box in its place and add the plywood faces around the platform, ensuring that the plywood is level. Fasten the plywood platform with basic screws.

Using the large hole you just made in the plywood as a guide, cut an opening in the return box. Allow the unit to have a little bit of height over the return opening so that you can access the filter more easily. Apply mastic to the top, and then add the filter base and unit.

Clean the existing supply duct with alcohol and a rag. Then, cut some more duct board and use it to connect the supply duct to the unit. There should be plenty of foil overlap, and we recommend going over that foil overlap with some outward-cinching staples. Apply silver tape, fab tape, and masking tape before applying mastic. Remove the tape before the mastic is allowed to dry. In some cases, the unit will be directly underneath the duct, but it’s more common for it to be offset. You will need to cut the duct board at an angle with precise measurements in the latter case. We also recommend sealing the base of the unit.

Then, flow nitrogen while brazing in a new filter-drier and the air handler. Protect heat-sensitive components with a wet rag or a heat-blocking putty. Using a neutral or slightly carburizing flame, heat the base material to a cherry red color and draw the alloy into the joint. Do a pressure test and use a leak reactant to check for leaks. Pull a vacuum and ensure that the system passes the decay test.

Ensure that you have the correct breaker size. Then, install the high-voltage wiring and auxiliary heat strips; the wires should be appropriately sized for the minimum circuit ampacity (MCA).

Pipe in the PVC drain using a pipe sealant. Then, make sure your drain has a trap, vent, and cleanout. Assemble PVC connections with medium-duty PVC cement.

Wire in the low-voltage connections at the unit. Set the ECM blower board to match the system tonnage as necessary. Make sure the connections are appropriate at the thermostat and seal the opening with putty. Test in heating and cooling mode, making sure to check your heat strip amperage.

Then, you can set the charge after letting the system equalize by running for at least 20 minutes. Weigh in the charge with a scale.

Check the system delivered capacity, delta T, total external static pressure, system airflow, and other important test measurements.

Рекомендации по теме
Комментарии
Автор

Always incredible work/instruction. Thank you for all of your content/material.

Sparky
Автор

It's pretty sad out there in the field, I haven't seen an install this good ever !

Garth
Автор

one bad dude!!! tech, humor, great teacher and down to earth personality! he’s rare guys! very rare. i’ve learned more from him fast than anywhere else. thx B!

paulbryant
Автор

IT WOULD BE SO AWESOME IF YOU DID A 3d ANIMATION ON A HORIZONTAL AIR HANDLER IN THE ATTIC

exclusive_
Автор

Maybe the best video on YouTube on this topic! Keep posting such great work guys!

marcokawar
Автор

Really great animation and instructions.

ramytk
Автор

Using multimedia and animation, changed the game drastically 🏎

abhijeetsinghsisodiy
Автор

Outstanding animation video of an air handler replacement. Keep up the great work.

kennethnapier
Автор

I've never used or seen the ship lap blue duct board tool, the v-cut red tool, or the duct square.

d.sack
Автор

I would love to do some duckboard duct work before I retire.
Awesome video as always

ChrisHVAC
Автор

Very well done - thank you so much. My home has duct board as well and what I don’t like is how it collects dust. However, modifications and replacement of panels is so easy, and super quiet. Seriously, I can’t tank you enough for your amazing presentation.

MrKen
Автор

Wow I am shocked this video is so good.

juicepark
Автор

Thank you! Im in south carolina, but most of this info is applicable to my state as well.

edwardwood
Автор

the white wire is connected to w1 on the air handler but is connected to w2 on the thermostat

qaswed
Автор

*Great Presentation, I have done many HVAC replacements in my life && this presentation was excellent, but keep in mind everyone has their own way or technique of installing. The process still follows the same sequence of operations. The old school way without the digital is still ok but ONLY if you truly know what your doing. Always double check with your freon gauges if issue cannot be figured out vs digital*

DrockzWorldTV
Автор

Cool as hot and cold way awesome graphics

avinashdesai
Автор

Brain, You do a VERY GOOD JOB IN YOUR CLASS AND VIDEOS. GREAT JOB.

waymonblevins
Автор

Amazing work. It's greatly appreciate.

KhaimDaTrucker
Автор

At 10:45, it seems that there is not an airtight seal between the return air duct box, and the plywood enclosure, allowing air to be drawn in from inside the plywood enclosure.

realvanman
Автор

I envy that you still work with duct board. We only utilize it if it’s currently with the old unit.

Alex-jooi