Step by step guide to setting up string lines on a construction site.
Step1.Fold the line back on itself.
Step2.Twist the 2 lines together 6 times.
Step3.Feed the loop over the stake.
Step4.Tension the line by pulling tight.
Step5.Tie off by looping over the stake twice.
Рекомендации по теме
Комментарии
Автор

Easy Peasy. Thanks For that pal. Keep em coming.

Hal-ndxs
Автор

wow that's almost like " the essential craftsman"

scottnever
Автор

Thank you.
This is a rare video on stringline tension.

jamesd
Автор

I'm laying some patio slabs at the moment and two things I have learnt is that having tight and accurate string line is a must and that watching string techniques on YouTube does not mean your lines will be tight or accurate. My technique is terrible and I know I need practice outside of this project but I'm in it now and I just wrap it up loads to get by but I'm not happy ha.

plummetplum
Автор

most people will never remember this and just wrap it 10x and loop it on a nail

tOxIc_TrEaSuRe
Автор

Thanks for that. One question how do you tie the first knot to get the tension on the second one, the same or different please? 0:15

andrewhopkins
Автор

There a way to sight the string line and make sure it’s straight from both ends of the stake? Apart from eyeing it. Was the most straight fence post

diamonddog
Автор

I SURE HOPE YOU TAKE THAT AZ POKE ....

chrisfisher
Автор

Shouldn’t really have pins that low if you fell that would be serious

breezeofficial
Автор

The worst way to set strings I use wooden stakes how are you gonna slide a string up on wood? Terrible

devintorres