filmov
tv
FFRE Stage 3 Ford 5.0L Coyote | From Short Block to Long Block - Unboxing & Assembly
Показать описание
This is a unboxing of a FFRE 2000HP Ford 5.0L Coyote Engine Short block. In this video you will find tips that will help you when you receive a new engine.
Yes, It is exciting receiving a new engine. Opening and unboxing everything to take a look at the beautiful machining work and new parts is a great feeling. We want to make sure it stays perfect and intact for when it's time to continue building and installing.
We will walk you through step by step from removing the engine from crate to handling and assembling the long block.
Take a look. If you have any questions or need assistance, Reach out to us and one of our Build Advisors will assist you.
Timestamps
00:00 FFRE Stage Long Block Assembly
00:12 Removing from the Crate
02:00 Installing the Rear Seal
03:22 Mounting the Engine to the Stand
04:41 Installing the Head studs
07:06 Installing the Cylinder Head
09:09 Torquing the Cylinder Head
13:28 Installing the Oil Pump
14:28 Installing the Lifters and Followers
15:45 Installing the Camshafts
17:49 Lifters, Followers, Camshaft on second Head
18:50 Installing the Timing System
21:58 Installing the Front Cover
22:42 Installing the Valve Cover
23:47 Installing the ATI Super Damper
25:37 Installing the Oil Pan
27:44 Ending
Thank you for watching! Don’t forget to Click SUBSCRIBE & turn on post notifications, click the bell 🔔 icon
Phone: 407-695-7223
Text / Whatsapp: 407-724-2484
•Follow us•
Yes, It is exciting receiving a new engine. Opening and unboxing everything to take a look at the beautiful machining work and new parts is a great feeling. We want to make sure it stays perfect and intact for when it's time to continue building and installing.
We will walk you through step by step from removing the engine from crate to handling and assembling the long block.
Take a look. If you have any questions or need assistance, Reach out to us and one of our Build Advisors will assist you.
Timestamps
00:00 FFRE Stage Long Block Assembly
00:12 Removing from the Crate
02:00 Installing the Rear Seal
03:22 Mounting the Engine to the Stand
04:41 Installing the Head studs
07:06 Installing the Cylinder Head
09:09 Torquing the Cylinder Head
13:28 Installing the Oil Pump
14:28 Installing the Lifters and Followers
15:45 Installing the Camshafts
17:49 Lifters, Followers, Camshaft on second Head
18:50 Installing the Timing System
21:58 Installing the Front Cover
22:42 Installing the Valve Cover
23:47 Installing the ATI Super Damper
25:37 Installing the Oil Pan
27:44 Ending
Thank you for watching! Don’t forget to Click SUBSCRIBE & turn on post notifications, click the bell 🔔 icon
Phone: 407-695-7223
Text / Whatsapp: 407-724-2484
•Follow us•
Комментарии