filmov
tv
Ship 24 Destacked from Booster 7 for Static Fire | SpaceX Boca Chica
Показать описание
Ship 24 was destacked from Booster 7 as SpaceX prepares for more static fire testing. Meanwhile, Ship 25 was removed from Suborbital Pad A and placed on a transport stand. Ship 25 has been undergoing cryo proof tests in the past week.
All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.
Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel.
L2 Boca Chica (more clips and photos) from BC's very early days to today.
0:00 Sunrise at Starbase
0:16 SPMT Moves to Launch Site
0:55 Paint Work on Orbital Launch Mount
1:24 Work Near Booster and Ship Connection Points
1:54 OLM Platform Lowered
2:15 Platform Removed from OLM
2:35 Ship 24 Ahead of Cryo Test
2:50 Ship Quick Disconnect Attached to the Stack
3:05 Venting on Booster 7
3:26 Booster 7 Cryo Testing
4:43 Tank Farm Post Test
5:03 Depressurization of Ship 25
5:24 Ship 25 Moved to Transport Stand
7:23 Ship Quick Disconnect Retracted Ahead of Destacking
8:13 Depressurization of Ship 24
8:33 Ship 24 Destacked from Booster 7
10:01 GSE Tank Arrives from Florida Starship Site
10:16 Ship 25 Disconnected from Crane
10:36 Ship 25 Moved to High Bay
All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.
Click "Join" for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel.
L2 Boca Chica (more clips and photos) from BC's very early days to today.
0:00 Sunrise at Starbase
0:16 SPMT Moves to Launch Site
0:55 Paint Work on Orbital Launch Mount
1:24 Work Near Booster and Ship Connection Points
1:54 OLM Platform Lowered
2:15 Platform Removed from OLM
2:35 Ship 24 Ahead of Cryo Test
2:50 Ship Quick Disconnect Attached to the Stack
3:05 Venting on Booster 7
3:26 Booster 7 Cryo Testing
4:43 Tank Farm Post Test
5:03 Depressurization of Ship 25
5:24 Ship 25 Moved to Transport Stand
7:23 Ship Quick Disconnect Retracted Ahead of Destacking
8:13 Depressurization of Ship 24
8:33 Ship 24 Destacked from Booster 7
10:01 GSE Tank Arrives from Florida Starship Site
10:16 Ship 25 Disconnected from Crane
10:36 Ship 25 Moved to High Bay
Комментарии