Brightline West advances high-speed rail project with soil testing along I-15 corridor

preview_player
Показать описание
Soil drilling and land surveys are underway near Jean to determine the best possible locations for the rail infrastructure as the project’s design phase advances.
Рекомендации по теме
Комментарии
Автор

Home Depot buckets are so simple yet so clutch, they are everywhere

stenbak
Автор

Bring back Amtrak to Union plaza station!

shdunvy
Автор

The people in Las Vegas and California needed this necessary train set last Christmas, but we never got it. We want our Golden Spike Ceremony before the inferno freezes over.

MrJuvefrank
Автор

No way it'll be finished by the Olympics, but still, great to see the project moving along.

TheWarrior
Автор

I always love California High-Speed Rail in California and Brightline West.😮

osmanhossain
Автор

The route of Amtrak's former Desert Wind passenger train between LV & LA still exists, if Union Pacific were to allow for interim operation until Brightline West is finished building.

RVail
Автор

Yes and yeah of course California High-Speed Rail in California and Brightline West.😮

osmanhossain
Автор

Though I am looking forward to this railway, I do not understand the concept of a single-track high speed railway.

TheRailwayDrone
Автор

I want to see it completed so bad, but there is no way they will have it completed by the 2028 Olympics like they want to.

crazikyle
Автор

Will brightline west also have to contend with surface traffic?

kpkp
Автор

China would have that whole thing built in 3 months for 1/4 the cost. Gotta love American bureaucracy.

nate
Автор

No way they complete it by 2028 Olympics.

TinLeadHammer