'Quality Control Tents Gone' Tesla Gigafactory Texas 9/3/2024 10:23AM

preview_player
Показать описание
Workers all over the cooling tower at the south extension. West side parking lots are almost empty. The tents where inspections were done are gone now.

Please Like and Subscribe to this channel. Click the bell for notifications.

#Tesla #Gigafactory #Texas #Austin #Model Y #Cybertruck #Family #Kids #Children #Construction #DumpTrucks #Scrapers, #Excavators
Рекомендации по теме
Комментарии
Автор

Please Like and Subscribe to this channel. Click the bell for notifications.

BTSflyer
Автор

Gr8 Soundtrack, Brad, and fantastic drone/camera action. Thank you!

BPassion
Автор

Thanks Brad.
*Sort by Newest First or Top Comments if only the first few lines are visible*
0:40. Southend, Cooling Tower. West face. Central black riser pipe doglegs before connecting the underside the top deck. 2 other black riser elbow into the Cooling Tower.
2:21. Parking Garage, north. Apron. Installing the lighting towers.
3:10. BIW, apron/easement. Bottom left. Stormwater drain works.
4:09. Southend, south. West Fire Escape passage. Bituminous paint/membrane applied to the corners of the entry slab.
Speculating a flat landing will be constructed here.
5:37. Westside, Tunnel Project. Spare liner segments removed.
6:16 Westside, Triangular Storage Yard. Transformer Stockpile no.2.
14, up from 7 in Brad’s previous fly over. Logo and style of transformer different the 72 at Transformer Stockpile no.1.
8:12.Sand Hill Lateral Pipeline Project. South of river. Left. Pits are evidently drilling mud dumps.
8:27. Sand Hill Lateral Pipeline Project. South of river. Top right. Yellow reamers to open up the HDD bore.
14:50. Battery North, apron. Around the Casting diagonal corner, Cybertruck front castings
15:15. Casting, diagonal corner. Apron. Cybertruck rear castings.
15:19. Casting, diagonal corner. Apron. On the corner. Small excavation seem to have a pair of screw piles in each.
Visible in the footings at 15:21 also.
15:21. Casting, east. Apron. Housekeeping pads, concrete placed. Rebar in the small footings to the east of the slab.
More pavement demolition.
15:33. Casting, Baghouse. HarderNL has correctly identified these conical ducts as “centrifuge-type devices to catch the largest particles before the dirty gas enters the box”.
Visible in the Nederman Mikropul video, TS Flat Bag Dust Collector with Secondary Filtration
at 0.46.
15:53. BIW, apron. Retaining wall footing under construction. Mud-base and footing formwork.
18:51. Far north storage. White casting racks may be for the Model Y structural battery pack equipped variant. I understand to not currently be in production.
*I’m travelling for a couple of weeks. Patchy internet. Might be slow with my comments*

DessieDoolan
Автор

love Frank Zappa "Sleep Dirt" music

andrewtancock-xd
Автор

🙋‍♂️ THANKS BRAD, FOR THE UPDATE 🤗💚💚💚

budgetaudiophilelife-long
Автор

Cooling towers seem awfully close to the power lines. I wonder if it will pose a problem during certain weather conditions such as fog.

biffhenderson
Автор

Thanks for sharing, Brad!! You are amazing!

dariomarquez
Автор

The speed of construction needs to be accelerated! In addition, employees’ cars should not be parked on the construction site to avoid hindering construction and asphalt paving.

io
Автор

It looks like they stopped using those QA tents possibly on August 22nd. That happens to be the day that drone footage from the Fremont plant showed them using an unmanned brightly lit video final QA tent. They drive through @ 5mph and go directly to the outbound lot.

bigtvjunky
Автор

More Tesla, less natural gas pipeline

jimw
Автор

Be storing castings in the southern extension before long. Should use the roof perhaps.

memrjohnno
Автор

Even more cooling trucks down the east side... GT underestimated cooling requirements from the get go by a wide margin. It should be remembered that GT has yet to pump out EVs at any significant volume though this may change very soon. Hopefully.

memrjohnno
Автор

Thanks Brad!
Transformers:
@ 6:31 and 9:24 Transformers look different? Would love to see the voltage ratings on the transformers @ 6:31

DavidJohnson-tvnn
Автор

Employee lot not as full as usual. Maybe more are using the parking structure, or some are taking a long holiday weekend. Didn't look like any Cybertrucks were coming out of the factory. I wonder if most of the Cybertrucks ended up at the railyard or if that group of 200+ in that one area were transported by semi-trailers.

bigtvjunky
Автор

Maybe quality control moved inside the building?

CarlWithACamera