filmov
tv
Quantity Surveying: Footing solving for rebars, GI Tie wire, formworks, concrete

Показать описание
Lec 1 | Estimation of footing concrete | Quantity surveying | Quantity of materials | civil tutor
Quantity Surveying: Footing solving for rebars, GI Tie wire, formworks, concrete
Quantity Surveying N4|Lesson 01: Taking-off Foundation
CALCULATE EXCAVATION QUANTITY FOR FOUNDATION / FOOTING.
Estimate Concrete Footings
Excavation Calculation For foundations
Quantity Surveying: Footing solving (FORMWORKS, CONCRETE, REBARS IN KG)
How to measure Site clearance,Removal of veg.soil,Reducing the level and Trench excavation.Part 1
Lec 2 | PCC Bed calculation | Estimation of Footing PCC bed | Quantity surveying | Civil tutor
Estimating Steel Works - Footing, Column, Beam, and Slab
Shoe footing all quantities calculations with example problem
Steel quantity calculation | Column footing | footing reinforcement details | BBS of footing | #RCC
HOW TO QUANTITIFY COLUMNS AND BASES|TAKING OFF|SUBSTRUCTURE|MEASUREMENTS
FOOTINGS OF 5 FLOORS BUILDING
Stepped footings all quantities calculations with example problem
cement Sand Aggregate calculation in concrete #concrete#civilengineering#material#calculation
Estimation by Long Wall and Short Wall Method | Two rooms estimation by Long wall and Short Wall.
basic knowledge of bar bending schedule of footing #darkilu #civilengineering#civilengineer #civil
Auto level survey
FOOTING REBAR ESTIMATE - PART 1/2
Estimation of RCC Column and Footing. RCC Column Footing Estimation @CivilConstruction
Quantity Surveying: Column Solving for formworks, Ties, GI tie wire, cement,sand, gravel
Detailed Quantity Survey - Concrete (Quantity Surveying) taglish tuturial
About civil engineering ||Calculate cement,sand, aggregate in 1cubic metre of M25 Grade concrete
Комментарии