I have fully explained the excavation process for footing with 3d animation. This topic is about quantity surveying of sub structure

Quantity surveying topics compiled PDFs 👇🏻👇🏻

Subscribe 2nd channel 👇🏻 @Civil Tutor Official

In order to do the calculation for footing at the construction site we need to follow some basic steps.
The first step is to do the excavation process in which we need to dig a pit for the foundation.
After levelling the bed properly, an anti termite powder is applied on the bed surface followed by a polythene covering on which PCC bed is laid.
The polythene covering acts as a barrier between concrete and soil mass.
If we don't apply the polythene covering the soil would absorb the water from concrete as a result, the concrete would lose it's strength. So to maintain the strength of concrete polythene sheets are laid before the application of PCC bed.
After laying the PCC bed, the next step is to cast the footing followed by raising the column above the footing.
The surfaces of the column and footing are coated by Bitumen paint up to the ground level.
The purpose of application of this paint is to protect the material of column and footing (concrete and steel) from the moisture content present in the backfill.

After watching the complete tutorial you will know;
How to calculate the quantity of materials required for building construction
How to calculate Cement sand and Aggregate quantity in footing
How to calculate the shuttering area for footing
How to calculate the Bitumen paint Area.
Quantity of materials required for m25 concrete

#quantitysurveying #civiltutor #ErMuyeenMubarak #footing #materialquantity

Quantity surveying compiled PDF 👇🏻👇🏻

Shear Force and Bending Moment PDF👇🏻👇🏻

2nd channel 👇🏻

What is water cement ratio?

What is 1.54 in concrete?
(How to calculate the quantity of water in concrete) 👇🏻👇🏻👇🏻

How to calculate volume of Cement bag?

Subscribe my 2nd channel 👇🏻👇🏻

Don't click here👇🏻😜

Queries solved;
How to estimate the quantities of footing
How to calculate Cement sand and Aggregate quantity in concrete
How to calculate Cement sand and Aggregate quantity in footing
How to calculate the shuttering area
How to calculate the Bitumen paint Area
Quantity of materials for footing
Quantity of materials for m25 concrete
Quantity surveying lectures
Footing excavation with 3d animation
Foundation excavation process
Рекомендации по теме
Комментарии
Автор

shuttering in m2 1.2+1.4+1.2+1.4=5.2 ans for 1 footing shutering

MyDaily-afghanistan-cricket
Автор

Is column starter compulsory for every building construction or house

statussongs
Автор

Nice explanation.Thank you.
Which software is used for 3d animation??

sathyabalasundaram
Автор

What kind of plastic sheet is being used? I couldn't understand

HayabusaRydr
Автор

Sir enroll krna tha kaise karna hai plz tell me

zameerquadri