In other animations, we showed how to frame and sheathe a simple floor like this. In this animation, we’re going to dig into this pile of studs to frame some walls.

Walls are framed flat on the deck and then stood. But before we begin framing the wall, we want to define its placement.

That is done with a chalk line, snapping a line 5-½ inches in from the outer edge of the floor framing.

With the line on the deck, we can spread out the plates and studs and assemble the wall.

Basic wall layout and assembly were covered in another animation, so we’re going to move on to sheathing and standing the walls.

Notice that this first wall runs the entire width of the foundation.

The cap plate will be held back a wee bit more than the plath width, so about 5-⅝ for a 2x6 wall. It is held back at each end so that the plates can interlock.

Sheathing can be installed vertically or horizontally; we are installing them vertically on this job.

Sheets should break in the middle of studs if the layout is correct and the studs are not bowed.

You could run the sheets from the bottom plate up to the top plate, but that wouldn’t tie the wall and floor assemblies together. Instead, hand the sheathing down past the bottom of the wall enough to span the rim joist and mud sill.

This joint will be sealed later with a high-quality sealant.

Temporary braces hold the wall plumb and relatively straight.

The next wall is the one at the opposite end. Again, snap a line, frame the wall, cover it with wall sheathing, and stand that wall.

The last couple of walls go between the first two. So, the stud layout is pulled from the outside of the floor frame, not the end of the plate. You can see that the second stud lines up with the four-foot line of the subfloor. The first stud is centered two feet from the outside edge of the floor framing.

The wall is tight between the first two. There is an interior bearing wall running the length of this little house, so ladder backing is added between the studs.

In order to sheathe and stand the wall, it may be necessary to pop those end braces off.

You can’t add the end pieces of sheathing because that sheathing needs to span the corner, but you can fill in the middle section.

Stand that wall, and run the cap plates to lock the corners together.

We need to leave a pocket for the intersecting wall here, again, a little wider than the plate in case you need some wiggle room when plumbing it.

Now we’re ready to build that last wall.

This one with a couple of windows.

Again, we pop off the braces, sheathe the middle of the wall, and stand it like magic.

Tie the corners together with the cap plate and leave the other pocket for that central bearing wall— which goes right there.

When installing cap plates, make sure to keep ant splices at least four feet apart.

And make sure that point loads are transferred. You were supposed to have tripled this floor joist to account for the point load when you were framing the floor. It is WAY easier to do before the subfloor is glued and screwed down.

OK, now you can fill in the corners to tighten up the structure.

Don’t pop those center braces just yet. You’ll need to run a string line down the length of the wall and add more braces if needed to push or pull the top of the wall to the line. The wall will be secured in a straight line by the roof frame

Subscribe to ProTradeCraft's YouTube channel for regular updates
Рекомендации по теме
Комментарии
Автор

I found the clarity of this production valuable

orionssativa
Автор

My gosh! Best Sketch Up video I have ever seen! Who is the talent behind the program? Such a shame this channel has only one comment, showing that people are stupid...and you guys are awesome!

lorrinrodrigueshs-bcp
Автор

Awesome video. Thanks for making this!

FirstName-nffx
Автор

I love your videos, they're live saving, also it will be very helpful if you could just make a video on how to install floor joist in the second floor where there is no wall in the first floor and it's a wide open floor..! Once again thank you..!

rasimidrizi
Автор

When you make the framing you should check for square when on the floor and lock down with 2x4's place diagonal across framing section(on inner side). After elevating and sheathing you may remove diagonal bracing..This will ensure a square frame so no racking is required with the sheathing panels/frame..

mindbender
Автор

measure in 5 1/2 inches for 2x6 walls. measure the length of the walls and square up the floor before you chalk out your lines. I like to lay out all my interior walls plus mark out doors and windows. This makes it easy to transfer on to plates without checking the plans plus it makes it easy to mark out overlap plates

steve
Автор

Framer here, ive never seen wall sheathing stood up 8ft always 4ft up 8ft across with staggered joints, locks the studs in better in theory. Is this common in other areas?

zachlong
Автор

Great animation, but why does the stud layout switch from 16 to 24"?

SnakeHandler-gu
Автор

Can you explain a little more on why I have to leave the plywood off of the corners?

andrewtrobaugh
Автор

Could the siding also be added while the wall is still flat on the floor? I'm about to build a shed next spring but on 1 side I only have like 1 foot of space after the wall is in place

guatf
Автор

what do you do with the 6-inch opening at the top, just below the top plate??

ifguzelbaba
Автор

Sheeting should not be straight up and down, but should be left to right, staggering.

-P-ROCK