Create S-Curve for Planned Target vs Actual Work from MS Project

preview_player
Показать описание
This video demonstrates how to create an S-Curve from MS Project to show both the Target and Actual work from a completed project.
Рекомендации по теме
Комментарии
Автор

Clear and straight to the point. Thank you. Liked and subbed

baba
Автор

very informative and helped in creating S curve. Thanks for in depth explanation!

DeepakKumar-gttg
Автор

Thanks sir, i managed to create the curve as instructed. I forgot to make the work baseline in the beginning. and the tick options..

Thank you!

christang
Автор

Wow! So love this channel. Thank you very much for sharing this tutorial

leumntv
Автор

This is perfect! Just what i was looking for! Great explanations!

dcpowered
Автор

I'm having 0 for all fields (actual work, cumulative work) in graph report, I have set baseline. Need help

ammadkhan
Автор

Sir, Thanks for guidance. please prepare one more video to guide us that how we can create "critical task report" in progress tab.

MuhammadZubair-jlnn
Автор

Hi Excel Insights. Thank you for the awesome video. Can you kindly compile a video on EVM analysis. Computing EV, PV and AC. Thank you

warrenjames
Автор

thanks for the information, but while I am generating the s curve report (baseline cumulative work VS Cumulative actual work), I am getting values 0 in the pivot table. unable to generate the s curve. would you pls help me with that?

shaikaarifilahi
Автор

Why my filter dont have monthly to drag like vdeo

muhammadamirin
Автор

This is truly outstanding and precise explanation! . Is it possible to assess or forecast the future rate of work by S-curve?

shyam
Автор

That's a great tutorial. Is possible to build the same chart but considering only Material Resource type?

filipefigueiredo
Автор

Hi sir, from available fields from visual reports, i dont have baseline cumulative work and cumulative work to add to selected fields.. what to do sir..?

syafeeqahsofi
Автор

This can be done directly in Project using reports. But how can you show work completed as a percentage rather than hours?

oootoob
Автор

do i need to complete all the actual start and finish date to generate the report? because i have set the baseline but the date are not complete yet as the project is ongoing, when i generate the report all the cummulative value in excel is 0

nurdiyana
Автор

Thanks a lot. Could you please clarify how to show different bars for baseline and actual/planned?

giacomov
Автор

Hi! Many thanks for the video. Is it posible to do this curve for a daily calendar?

ruigamito
Автор

hi, urgent may i ask why my baseline cumulative is all 0 ? but mu actual cumulative has the value

danishaiman
Автор

What represent number for baseline and actual cumulative work? what does the work
number mean?

amirulh
Автор

Hello, do you have the same for Primavera P6?