Ramp Construction_Techniques of Front Gate Ramp Concrete with Cement Mixer|Ramp Design

preview_player
Показать описание
This video content by,

Ramp construction/techniques of front gate ramp concrete with cement mixing/ramp design concrete/ramp flooring perfectly/amazing construction skills of construction works

all about construction works granite works tiles works plastering works elevation works bricklaying works design works concrete works formwork techniques all construction tips and tricks all to my channel keeping your support friends

Any,
like
share
comment
on this video

#ramp
#design
#concrete
#front
#gate
#cement
#building
#construction
Рекомендации по теме
Комментарии
Автор

Yes water logging should be prevented by the pipe running thru the base of the ramp, brilliant idea hari

rameshshankar
Автор

Work is nice.. But a pipeline or hole should be provided for smooth flow of waste water from either side

HariharanSubramanian-zbyo
Автор

Sorry this is not a Technical work.
No joints for the Ramp side walls connected to Gate pillars by cutting and removing the plastering.
No bricks and concrete blocks watered and cured.

The wall to be constructed one day the filling can be done .

No consolidation was done before pcc laying for Ramp.
But no pcc laid.

But the workmanship is Good and Harder.

Please try to upload Best work videos.

shaikreyazuddin
Автор

Mera bhim bohut upar hain, isko dal kaisay banaye

rjst
Автор

Saia é pra mulher 🚺 kkkk😅😅😅😅😅😅😅😂😂😂😂😂kkkk

ValterLuisIgnacio