Wiring Time or Fishing the Spaghetti Bowl

preview_player
Показать описание
Crawled under the layout to start the permanent wiring. This will take awhile since it’s only once a week. Running the wires to terminal strips and getting them labeled. Then they will be bundled to a central location.
Рекомендации по теме
Комментарии
Автор

I’m having visions of you under the layout in W. York, wiring the old “PDC”. I think I still have the plywood with the long rows of barrier strips. 😁

joekrepps