filmov
tv
SLS RS-25 Engine Test, 8 March 2023
Показать описание
An Aerojet Rocketdyne RS-25 rocket engine was tested on the Fred Haise Test Stand (formerly A-1 Test Stand) at the John C. Stennis Space Center in Mississippi, on 8 March 2023, at 22:05 UTC (16:05 CST, 17:05 EST). This was the third hot fire test in a planned 12-test series of the newly redesigned RS-25 engines that will be used beginning with Artemis V. The engine operated at up to 111% power level, the same level needed to help power NASA’s Space Launch System (SLS). The test had a duration of 520 seconds.
Credit: NASA
#RS25
Credit: NASA
#RS25
SLS RS-25 Engine Test, 8 February 2023
SLS RS-25 Engine Test, 8 March 2023
SLS RS-25 Engine Test, 8 February 2022
SLS RS-25 Engine Test, 8 June 2023
The SLS RS-25 Engine: Eight Minutes of Pure Power
SLS Green Run #2 - NASA Successfully Fires RS-25 Main Engines for 8 Minutes
SLS RS-25 Engine Test, 22 February 2023 (600 seconds test)
SLS Core Stage Hot Fire Test (full duration)
SLS RS-25 Engine Test, 21 March 2023 (600 seconds test)
SLS RS-25 Engine Test, 14 December 2022
SLS RS-25 Engine Hot Fire Test
SLS RS-25 Engine Aborted Test, 12 December 2018
Hot Fire Test for RS-25 Engines
NASA SLS megarocket engine fired up for over 8 minutes in test
SLS RS-25 Engine Test, 14 August 2018
SLS RS-25 Testing Heats Up
NASA SLS Main Engine Test Fire
SLS RS-25 Engine Test, 30 March 2022
SLS RS-25 Engine Test, 15 June 2023
SLS RS-25 Engine Test, 28 February 2019
Future SLS Rocket Engine Test Fired at Full Power | RS-25 | Video
SLS RS-25 Engine Test, 5 April 2023
SLS RS-25 Engine Test, 15 December 2021
SLS RS-25 Engine Test, 26 April 2023 (720 seconds gimbal test)
Комментарии