Pre-construction preparation

1. Material preparation :
Select qualified hot-melt speed bump materials with good wear resistance, compressive strength and other properties. Meanwhile, prepare corresponding primer and other auxiliary materials !

2. Tool preparation :
Prepare a vibrating machine (make sure the equipment can work properly and adjust all parameters well), a hot-melt kettle (used for heating and melting materials), brooms, blowers and other cleaning and auxiliary construction tools !

3. Site cleaning :
Sweep the construction section clean, remove dust, debris, stones and so on. If there are oil stains or other stains, they can be cleaned with appropriate cleaning agents and then dried to ensure that the road surface is flat, clean and dry, which is conducive to the good bonding of the speed bumps and the road surface !

Construction process

1. Positioning and marking :
Determine the installation position of the speed bumps according to the design requirements and the actual road conditions. Use marking paint or other marking tools to make clear and accurate marks on the road surface, ensuring that the intervals between the speed bumps meet the standards !

2. Heating materials :
Put the hot-melt materials of the speed bumps into the hot-melt kettle and heat and melt them at the specified temperature (usually around 180 °C - 220 °C, specifically according to the material requirements). Stir constantly during the period to make the materials heated evenly !

3. Primer coating :
Uniformly apply a layer of special primer on the marked road surface installation position to enhance the bonding strength between the speed bumps and the road surface. Wait until the primer is dried to an appropriate degree (generally according to the time required in the product description).

4. Material laying :
Pour or lay the melted hot-melt materials through a special discharging device on the road surface position where the primer has been applied. Use the vibrating machine to vibrate the newly laid materials to form the speed bumps with small raised bumps. During the vibrating process, control the frequency, intensity and walking speed of the vibrating machine and other parameters to ensure that the size, height and spacing of the raised bumps of the speed bumps meet the standard requirements, and the overall appearance is flat and dense !

Post-construction treatment

1. Trimming and cleaning :
After the speed bumps are initially formed, trim the edges and other parts in time, remove the excess materials to make the edges neat. Meanwhile, sweep the surrounding road surface again and clean up the waste generated during construction !

2. Cooling and curing :
Let the laid speed bumps cool and solidify naturally. Avoid vehicle rolling before they are completely cooled and solidified. The curing time depends on factors such as material characteristics and environmental temperature. Generally, it takes several hours to a day or so. After they reach the designed strength, they can be put into normal use !

During construction, it is necessary to strictly follow the construction guidelines provided by the material manufacturers and relevant traffic facility construction specifications. Moreover, do a good job in construction safety protection measures and set up warning signs to avoid affecting the normal traffic order and causing safety accidents !