Part 7 - Relay Pumping Drill - Delaware, Ohio - April 2015

preview_player
Показать описание
We join the relay pumping drill as another pumper is added into the relay at a point where a traditional LDH manifold appliance was left. The manifold worked fine as a control valve but proved troublesome when it came time to add the pumper in. The only way to add the pumper was to shut down the water flow in the hose line. The video is narrated by Mark Davis of GBW Associates, LLC.
Рекомендации по теме
Комментарии
Автор

We use this manifold for rapid brush rig stations. Refill 4 brush rigs at once or 2 brush and 1 tender

KosukiFire
welcome to shbcf.ru