Philippine House Building Day 59 - Interiors

preview_player
Показать описание
Philippine House Building Day 59 - Interiors

A first look at the possible interior design of a couple of the main rooms - kitchen, master bedroom and master bathroom. These interior designs will have changes, but might be quite close to the final result.
Otherwise, lots more work to prepare for the second floor slab, including stirrups bent to more than 90 degrees !
The front (east) and south wall see good progress.
With some bad weather in the forecast, overtime has kicked in.

Background to the design images:
Photo by Olga Thelavart on Unsplash
Рекомендации по теме
Комментарии
Автор

Good to see some of your internal renderings. We have also just finished approving our final renderings and now they will produce a 8 min video of the project. Good for us as will wont start building in Poaoy until 2024 upon my retirement. your home is coming along great, really like the methods and materials they are using, fantastic build my friend.

larrylangdon
Автор

I built a 9ft and 22ft wide garage with bi-fold glass doors. On the inside of the glass I used opaque film, this allows light in but still maintain privacy so people can't see inside. I have used it on a glass shower door too.

georgeplaxton
Автор

More of same, yes, but growing. Like the drone shots. I think 10.13 is close to showing the whole plot in one shot which is something I don't remember seeing.

stephenp
Автор

Looks good! Love the process and interior plans. Thanks for showing the angles of the stirrups. 152 supports is a lot of support but they are greatly needed to carry all that weight. Since you have a large floor space will the engineer leave the supports in for 30 days or longer?

MrThunderdome