filmov
tv
Office of the Future : Dubai's 3D printed office bags Guinness World Record
![preview_player](https://i.ytimg.com/vi/FW74RSxjJpM/maxresdefault.jpg)
Показать описание
The first 3D printed commercial building was achieved by Dubai Future Foundation (UAE), in Dubai, UAE on 20 February 2020.
A 3D-printer measuring 20 feet high, 120 feet long and 40 feet wide was used to print the building. The entire structure was printed using a giant cement printer, then assembled on site. Printing took 17 days and was installed on in 2 days.
For more details:
call us: +971-55-5099157
toll free: 800-BINAYAH (2462924)
A 3D-printer measuring 20 feet high, 120 feet long and 40 feet wide was used to print the building. The entire structure was printed using a giant cement printer, then assembled on site. Printing took 17 days and was installed on in 2 days.
For more details:
call us: +971-55-5099157
toll free: 800-BINAYAH (2462924)