Why SpaceX Could Be Forced To Abandon Starship Payloads Until 2024!

Показать описание
SpaceX has been working extremely hard to prevent a complete structural failure of Ship 24's interstage and payload section during Max Q. In this episode we will investigate how this situation developed starting from the day SpaceX was forced to move on from Ship 20 and Booster 4.
This is intended to be an example of issues that can occur during the rapid iteration process when the manufacturing begins to outpace vehicle qualification testing.
Join this channel to get access to exclusive perks:
Please consider supporting CSI Starbase on:
CSI Starbase Production : Geoff Allan
Huge thanks to the following photographers and content creators who make all of this possible!
▶︎Andi Ashtorak - Starbase Simulator:
🎤Andrew Keating of Cosmic Perspective
▶︎Chameleon Circuit - Starship & Test Tank Animations
▶︎Cosmic Perspective
📷Greg Scott - Kennedy Space Center Photographer
📷 Kevin Randolph - for WAI Media
▶︎ LabPadre - 24/7 Starbase Livestreams
▶︎Marcus House
▶︎ NASASpaceflight
▶︎ Nick Henning Lunar Starship Simulation
▶︎ RGVAerialPhotography - Starbase Weekly Livestreams
▶︎ Ryan Hansen Space - CSI 3D Forensics Agent
📷 Starship Gazer - Starbase Photographer
Most of the music is from the YouTube Audio Library except:
SpaceX has been working extremely hard to prevent a complete structural failure of Ship 24's interstage and payload section during Max Q.
Last but not least I want to give HUGE SHOUTOUT to the entire CSI Starbase team on discord. This dedicated team of 100+ agents with specialties ranging all across the board, has been crucial in getting the most accurate info for these episodes. Couldn't do it without yal!
0:00 Intro - SpaceX Biggest Fear
2:15 Part 1 Review
5:46 Sponsor Segment
7:29 How did we get here?
8:57 B7 - New Thrust Puck Testing
11:18 B7 - Downcomer Failure Analysis
14:25 S24 - Design Upgrades & Initial Testing
15:25 S24 - Pre-Press Failure Analysis
18:32 B7.1 - Structural Verification of Booster Aft Section
19:30 Booster Thrust Bearing Structure Analysis
20:21 B7.1 Special Can Crusher Configuration
22:45 B7.1 Partial Failure - Crushed!
23:23 S24 & B7 Testing Ramps UP
25:05 Autogenous Pressurization Summary
26:05 S25 & B7 Testing Continued
26:40 B7.1 Returns from Repairs
27:40 Importance Of Spin Prime Testing
28:28 B7 Static Fire Campaign Ramps UP
29:05 E-Dome Test Tank Analysis + S25 Testing
31:58 S25 - Testing Begins
32:20 B7 Static Fire Campaign Cont.
33:40 S24 - Payload Bay Structural Issues
40:15 S24 - Temp Solution To Payload Bay Issues
46:10 New Modifications - Payload Door
48:34 S24 - Aft Section/Interstage Structural Issues
52:00 S26.1 Testing New Modifications To Ship Aft Section
58:01 How did this happen?
1:00:00 B6.1 - Structural Qualification of Booster Interstage
1:01:30 NC31 - Remaining Structural Verification Prior To Launch
1:03:00 Final Thoughts and Outro