filmov
tv
Starship Launch Pad Foundation Upgraded | SpaceX Boca Chica
Показать описание
SpaceX drilled for and installed new piles to repair and upgrade the orbital launch mount as they prepare for the next Starship flight. Also, two buildings were demolished to make room for new production facilities.
⚡ Become a member of NASASpaceflight's channel for exclusive discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡
✂️ Edited by Thomas (@_thomashayden).
🔍 All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.
L2 Boca Chica (more clips and photos) from BC's very early days to today.
#starship #spacex #bocachica #starbase
Timestamps:
0:00 Booster 10 Put in Rocket Garden
0:53 Sunrise Over the Launch Site
1:03 Fabrication Building Deconstructed
1:21 Concrete Pump at the OLM
1:41 Earthwork Near the OLM
2:25 Crane Disassembled
2:41 And Brought to the Production Site
2:52 Crane From Roberts Road Rises
3:12 Windbreak Demolished
3:52 Drilling Rig Returns to the OLM
4:04 Piling Driving Into the Ground
4:24 Rebar Installed
4:32 The New High Bay
5:55 New LR 11000 Crane
6:18 Ship 26 and the Rocket Garden
6:29 Booster 10
7:10 Ship 26
7:56 Booster 9 in the Mega Bay
8:17 Ships 29 and 28 in the High Bay
8:27 The Production Site
8:58 Fabrication Building Demolition
9:25 Raptor Maintenance Platform
9:37 Edge of the Production Site
10:01 Trench to the Launch Site
⚡ Become a member of NASASpaceflight's channel for exclusive discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡
✂️ Edited by Thomas (@_thomashayden).
🔍 All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF.
L2 Boca Chica (more clips and photos) from BC's very early days to today.
#starship #spacex #bocachica #starbase
Timestamps:
0:00 Booster 10 Put in Rocket Garden
0:53 Sunrise Over the Launch Site
1:03 Fabrication Building Deconstructed
1:21 Concrete Pump at the OLM
1:41 Earthwork Near the OLM
2:25 Crane Disassembled
2:41 And Brought to the Production Site
2:52 Crane From Roberts Road Rises
3:12 Windbreak Demolished
3:52 Drilling Rig Returns to the OLM
4:04 Piling Driving Into the Ground
4:24 Rebar Installed
4:32 The New High Bay
5:55 New LR 11000 Crane
6:18 Ship 26 and the Rocket Garden
6:29 Booster 10
7:10 Ship 26
7:56 Booster 9 in the Mega Bay
8:17 Ships 29 and 28 in the High Bay
8:27 The Production Site
8:58 Fabrication Building Demolition
9:25 Raptor Maintenance Platform
9:37 Edge of the Production Site
10:01 Trench to the Launch Site
Комментарии