MEMORIAL DAY WEEKEND AT GIGA TEXAS! - Tesla Gigafactory Austin 4K Day 5/26/24 - Tesla Terafactory

preview_player
Показать описание
Please enjoy the video and as always, I appreciate all comments, questions, statements, proclamations and otherwise below!

THANK YOU FOR YOUR SUPPORT!!

#gigatexas #tesla #cybertruck

QUAD SQUAD CHANNELS

Jack - Texas Terafactory (FLIGHTS SUSPENDED)
For 4K flights over new areas and “first looks”, there’s no better source than:

Randy - Terafactory Texas (FLIGHTS SUSPENDED)
For a unique perspective and consistent updates later in the day that show progress within a single day, your must-view source is:

Joe - Joe Tegtmeyer
For deep-dives into the mechanics of construction, indications of future plans and overall comprehensive coverage, your go-to source is:

Jeff (me) - Jeff Roberts
And for your weekly fix for 4K cinematic fly-overs with occasional “celebrity” appearances, the place to be is:

Together, we are the “Quad Squad” and there’s no better coverage of Giga Texas anywhere!
Equipment used:
iPhone 11 Pro Max
DJI Mavic Air 2
DJI Mavic 2 Zoom
DJI Smart Controller
DJI Mavic Mini 2
Autel EVO II 8K (used on this video)
Blackmagic Pocket Cinema 4K

Music in this video:
Artist: Joe Solo
Song: "Awesome Flow"

"It is my pleasure and an absolute honor to be "gifted" the access to sit in the front row of the world theater to witness the best performance of human progress yet!" - Jeff Roberts 2020
Рекомендации по теме
Комментарии
Автор

Thanks Jeff.
1:40. Southend. Cooling tower. White items would be the drive motors for the fans. ICT signage for our benefit. International Cooling Towers of Deer Park, Texas.
2:59. Battery, west. Apron. Bins of 4680 battery cans etc.
3:36. Tesla Road. Trenches extended to the full width of the road.
4:26. East Parking Lot. Car fire location. Can’t have been an EV, would have been all over the news otherwise. I think that’s 3 vehicle fires in these videos in 4 years.
4:58. Parking Garage. Low enough flight to be able to see through the building.
5:39. Far East Contractors yards. Pipe Fabrication workshops. I wonder if any details about the Data Centre cooling system can be extrapolated from these pipes being spray painted in a gloss paint. I would guess uninsulated, exposed to view perhaps.
7:30. Die Shop, west. Pair of empty IDRA delivery crates.
9:40. Westside. Tunnel Project. Conveyor belt cassette. Additional conveyor added, lower beam dropped.
10:20. Westside north. Storage yard. Evapco units. Not for the Southend Cooling structure as it turns out.
Left. 5 white pressure vessels of varying sizes and orientation.

DessieDoolan
Автор

12:53 the roof looks like it needs a good cleaning from all the dust that’s settled there. Looks like a job for a group of Optimus humanoid robots armed with power wash hoses!

ismailnyeyusof
Автор

Tesla should have a "Spring Clean up Day". A lot of finished areas look like a Big "Junk Yard"...maybe take a few lessons from Giga Berlin!!

pauldelrossi
Автор

Thanks Jeff! Great to have coverage on a Sunday especially before a holiday!

NickoMcbrainRules
Автор

My OCD would power wash the roof every other day. 😝😝

JB-ejqy
Автор

Now everyone power down and enjoy the rest of the weekend.

stevencaskey
Автор

Incrível documentário grata por poder assistir sucesso sempre no aguardo dos próximos conhecimento e vida

lourdessilva
Автор

Thanks Jeff!
Power:
Northside of casting:
@ 0:21 (Bottom) Rebar placed around vault for concrete pour.
@ 3:35 (Left) Trenching and construction of 2 duct-banks, 12 conduits each.
Rooftop cable trays:
@ 1:25 (Bottom right) Two cable spools on top of the work platform ready for cable pull along 3, 600 feet of cable trays.
@ 12:55 (Bottom right) to 13:30 (Right) About 3, 600 feet of double stack cable tray being constructed along the east parapet wall. That is, based on measurements from Google Earth.

Cooling Structure:
@ 1:35 (Bottom right) 8 stacks of fan shroud segments to be placed around the circles in the top of the structure.

Fiber optics:
@ 2:47 (Bottom left) Trench surrounded by black fence from the north end of the HDD bore to the freeway berm. There is another HDD bore at the top of the berm north to the freeway exit. Spool of orange conduit @ 3:09

Megapacks:
@ 8:33 Once again.... Caution tape around the northwest corner of the yard.

DavidJohnson-tvnn
Автор

Nice one Jeff! Always the most relaxing your of Iga Texas, progress is amazing thanks for continuing to share!

davec
Автор

Almost all the tunnel wall segments have been used but they added lots of dirt spoil conveyer belt so more tunneling to go.

KenWerkSolar
Автор

Always looking for your flyovers, You've been since the beginning!More Power to you!:)

richardrhodes-gcko
Автор

well now that Texas giga has a virtual ps, that can make money, only logical to build a data centre.:)

richardrhodes-gcko
Автор

I Suspect the Tunneling operation will have 3 outlets, not one.:)

richardrhodes-gcko
Автор

Sure looks like cranking out cars is not their top priority. AI and robotics is.

franklinmargolis