filmov
tv
How to Use an Auto Level Instrument for Linear Measurement
Показать описание
Site surveying requires reading the E-Staff or levelling Rod or simply surveying measuring staff. This video will give you a brief idea on how to read a staff in civil engineering surveying.
Reading the E-Staff or rod is a skill expected from a construction, civil engineering and surveying students and professional. This video will walk you through steps on how to read the Staff easily, especially for beginners.
SURVEYING: What is the Top, Middle and Bottom Hairs STAFF Readings?
#kelvinAcademy #kelvinAcademyVideos
Site engineering involves using various instruments and methods to prepare the construction site for the substructures or for the superstructure. A lot of tasks must be completed before other construction professionals can carry out their specific roles on that site. At times, an architect will want the land surveyor to complete their tasks before they can fully develop their own architectural plans for the project.
Surveying field book table for recording.
Table difference between HOC and Rise and Fall.
The instrument needed for the levelling (Auto Level).
The difference between Auto level and dumpy level.
Auto level, surveying tripod stand, survey levelling staff or rod.
Plumb bob in surveying (what it's used for).
What is surveying benchmark (How to identify site benchmark).
GPS and GIS with site benchmark.
How to record surveying field data.
How to record the benchmark values on table.
What is Backsight in surveying and how to record backsight.
What is Intersight (intermediate sight) in surveying and how to record intersight.
What is a foresight and how to record foresight.
How to read the cross hair in surveying.
Staff or rod movements and points to measure.
Manhole, marked points on site, curbs, gutters, permanent site structures, etc.
Foundation setting out with theodolite, total station or measuring tape.
Difference between a total station and a theodolite.
Purpose of levelling in surveying.
How to calculate levels using height of collimation.
How to check for Height of Collimation with formulas.
Sum of backsight and foresight.
Last reduced level minus first reduced level.
How to calculate levels using Rise and Fall methods.
Formulas for checking the accuracy of rise and fall in surveying.
Conclusion of Height of Collimation and Rise and Fall surveying.
#kelvinAcademySiteEngineeringSurveying #kelvinAcademy #kelvinAcademyVideos
Introduction to traverse surveying
Traverse calculation question
Basic explanation
Solution to the traverse surveying question
SOLVE FOR THE CLOSED TRAVERSE SURVEYING (Real Life Site Construction Calculation)
Traverse surveying procedure.
Closed traverse surveying calculation.
Closed and open traverse surveying.
Traverse surveying problem and solution.
Traverse surveying problems and solutions.
What is traverse in surveying
Advantages and disadvantages of traverse surveying
Types of Traverse in surveying
Closed traverse surveying procedures
Traverse surveying calculations
Surveying traverse
traverse surveying procedure pdf
traverse surveying procedure
Surveying traverse pdf
traverse surveying ppt
traverse surveying meaning
open traverse
Traverse calculation
Traverse calculations
Traverse calculations pdf
Height of Collimation (HOC) Surveying
Rise and Fall Method Surveying
Tripod surveying
Automatic level surveying
Auto Level surveying
site engineering surveying
Staff surveying
Rod surveying
Spirit level bubble
Linear measurement surveying
Chainage surveying
Run measurement surveying
kelvin academy, kelvin academy YouTube, kelvin Nwoha, height of collimation, rise and fall method, back sight, backsight, fore sight, foresight, backsight and foresight in surveying, backsight in total station, auto level survey, auto level instrument, total station, auto level training, how to calculate height of collimation, how to calculate rise and fall, applications of the auto level surveying, formulas to check for height of collimation, formulas to check for rise and fall accuracy, intersight, inter sight, intermediate sight, what is back sight, what is backsight, what is intersight, what is foresight, what is inter sight, what is fore sight, how to use an auto level surveying, land surveying, land surveyor
how to read the staff, how to read metric staff, how to read a staff level, e staff reading, rod reading surveying, rod reading, staff rod reading, staff reading in surveying, staff reading in levelling
Комментарии