Dallas Trinity River Standing Wave Whitewater Construction

preview_player
Показать описание
A close look at the now failed Dallas Trinity River Standing Wave project during the final construction phase, December 19, 2011. Video shows various components of the standing wave project including the often mentioned canoe bypass. The bypass is difficult to navigate in a large 2 person canoe, due to the vertical drop off the second wave section.

Copyright Ben Sandifer 2016 All Rights Reserved. No rebroadcast or use without my written permission.
Рекомендации по теме
Комментарии
Автор

That's awesome, Ben. I look forward to footage of the DECONSTRUCTION. :)

chickensmack