INDUSTRIALISED BUILDING SYSTEM (IBS) IBS_HCPS_Monolithic Wall System

preview_player
Показать описание
How does it benefit the Developer, the Consultants, fellow Builders, Property Owners and the Malaysian Construction Industry?

How do you survive the current ongoing pandemic if you were a developer?

You improvise. Having up to 85% of the production off-site, the amount of on-site labour can be reduced to a minimum to overcome the challenges to practice social distancing amidst the ongoing COVID 19 outbreak. With that, the project can complete on schedule and the health risk of the workers kept to the minimum.

"Industrialised Building System Provider is one who knows the way, goes the way and shows the way."

Acceptance of IBS – Challenging when we have more guidelines?

There is a story saying, building a life-saving prototype in a developed country is far more difficult than in a rural area.

It’s so true that as developers in smaller and less populated town like Kuala Pilah / Bahau has willingly accepted and enjoying the advantages of full IBS and has no problem to embark on the system in real housing projects, larger developers raised a lot of doubts about IBS.

In Kuala Pilah / Bahau project, HCPS has demonstrated remarkable statistics at which 10 units of residential houses were fully completed in 26 days with only 10 workers.

This is a proven track record that HCPS Monolithic Wall System is not only efficient in speed but it also reflects tremendous saving of local currency outflow particularly in labour wages.

" Construction Technique "

HCPS full IBS monolithic wall system.

Your One-Stop-Center for Industrial Building System (IBS) Solution.

- In-house Engineering
- Off-site 85%
- On-site 15%
- Precast panel wall
- Precast Beam
- Precast water tank slab
- Precast half-slab

Real Experience, Professional Implementation & Ideal Technology.

Not just Theory but it’s Real.