Achievement :
Using only 10 workers for 28 days, a total completion of 10 units single storey terrace residential houses.
The HCPS, a full IBS monolithic wall system has successfully demonstrated in :
(a) minimizing outflow of currency due to reduction of foreign worker dependency.
(b) speedy construction time.
(c) high degree of quality control with the possibility of eliminating cement render or plastering work.
(d) minimizing site discrepancy issue.
23th October 2020
Last site casting on 13th Oct 2020, and all in-situ mould and temporary support will be dismantled in compliance to BSI requirement on 26th Oct 2020
Social Responsibility and Environmental friendly.
HCPS full monolithic wall IBS makes it possible to have construction site that has produced almost ZERO construction waste as shown in video.
The site remains clean during and after construction.
Tidy up all tools, props and mould for demobilization to HCPS's factory at Rasa.
Project Bahau Kuala Pilah :
10 units single storey terrace house.
HCPS : - Full monolithic wall IBS system.
Block A & B : 10 Units
Ground level & Roof level
- Grinding uneven concrete surface.
- Touch up.
Your One-Stop-Center for Industrial Building System (IBS) Solution.
- In-house Engineering
- Off-site 85%
- On-site 15%
- Precast panel wall
- Precast Beam
- Precast water tank slab
- Precast half-slab
Real Experience, Professional Implementation & Ideal Technology.
Not just Theory but it’s Real.
How does it benefit the Developer, the Consultants, fellow Builders, Property Owners and the Malaysian Construction Industry?
How do you survive the current ongoing pandemic if you were a developer?
You improvise. Having up to 85% of the production off-site, the amount of on-site labour can be reduced to a minimum to overcome the challenges to practice social distancing amidst the ongoing COVID 19 outbreak. With that, the project can complete on schedule and the health risk of the workers kept to the minimum.
Using only 10 workers for 28 days, a total completion of 10 units single storey terrace residential houses.
The HCPS, a full IBS monolithic wall system has successfully demonstrated in :
(a) minimizing outflow of currency due to reduction of foreign worker dependency.
(b) speedy construction time.
(c) high degree of quality control with the possibility of eliminating cement render or plastering work.
(d) minimizing site discrepancy issue.
23th October 2020
Last site casting on 13th Oct 2020, and all in-situ mould and temporary support will be dismantled in compliance to BSI requirement on 26th Oct 2020
Social Responsibility and Environmental friendly.
HCPS full monolithic wall IBS makes it possible to have construction site that has produced almost ZERO construction waste as shown in video.
The site remains clean during and after construction.
Tidy up all tools, props and mould for demobilization to HCPS's factory at Rasa.
Project Bahau Kuala Pilah :
10 units single storey terrace house.
HCPS : - Full monolithic wall IBS system.
Block A & B : 10 Units
Ground level & Roof level
- Grinding uneven concrete surface.
- Touch up.
Your One-Stop-Center for Industrial Building System (IBS) Solution.
- In-house Engineering
- Off-site 85%
- On-site 15%
- Precast panel wall
- Precast Beam
- Precast water tank slab
- Precast half-slab
Real Experience, Professional Implementation & Ideal Technology.
Not just Theory but it’s Real.
How does it benefit the Developer, the Consultants, fellow Builders, Property Owners and the Malaysian Construction Industry?
How do you survive the current ongoing pandemic if you were a developer?
You improvise. Having up to 85% of the production off-site, the amount of on-site labour can be reduced to a minimum to overcome the challenges to practice social distancing amidst the ongoing COVID 19 outbreak. With that, the project can complete on schedule and the health risk of the workers kept to the minimum.