filmov
tv
Ideco Speed Kit Comparison

Показать описание
Comparing tripping pipe using the Ideco Dual Speed Kit vs the conventional method. In this study, the speed kit is seen to eliminate roughly 27 seconds per stand while RIH, and 22 seconds per stand while POOH.
The transfer elevators move stands to/from the derrick, allowing the main elevators and blocks to stay busy only on the heavy lifting of the tubing string.
The transfer elevators move stands to/from the derrick, allowing the main elevators and blocks to stay busy only on the heavy lifting of the tubing string.
Ideco Speed Kit Comparison
Ideco speed kit
Pulling tubing with speed kit
Ideco workover rig with dual speed block
IDECO H-1000 HP Rig Located in New Mexico
Rig down ideco... Oseil
Rig Sales Australia - Ideco Workover Drill Video
IDECO 10 KULE(1)
workover rig
testing workover rig xj750
WILSON MOGUL 42 WORKOVER RIG 1767T vid6
Straub Corporation Rig 9 Walkerneer Apache 250-40 Martin Straub
Easternwell ALRx Rig Build Timelapse
Straub Corporation Rig 9 Walkerneer Apache 250-40 working
Work on a current project in South Texas
WALKER-NEER 250-40 DRILL RIG FOR SALE (Ref#1744T) VID 1
Norieros De Texas
WorkOver Rig
invest in producing oil wells | Prickly Pear Energy
Wellsite Decommissioning- Service Rig Floor/Mise hors service d'un puits - Plancher de gréement...
Burning brakes on the rig
Tripping pipe
Workover Rig/ in n out the whole....
Certek - Service Rig Heating
Комментарии