BART completes Transbay Tube seismic retrofitting project

preview_player
Показать описание
BART has completed its earthquake retrofit of the Transbay Tube, the transit agency announced Monday as it celebrated 50 years since the first train traveled in the underwater tunnel linking Oakland and San Francisco. Bob Redell reports.

Stay connected:

Catch up on all the day's news:

Download our mobile app:

Watch us on OTT:
Рекомендации по теме
Комментарии
Автор

I remember back in Sept 1974 when the Trans-Bay tube 1st opened I recall in early 1975 my mom and I with my sister and her aunt rode Bart to SF it was a very exciting time.

TheTheo
Автор

BART made the Kessel Run in less than 12 parsecs.

DemPilafian
Автор

build the second bart tube, the system should be 24 hour service!

laeihbvaljefhbvalejfhbv
Автор

Please do something about the noise from the trains running on the tracks! It is piercing and deafening!

GKP
Автор

The Bay Bridge has been "retrofitted"

sense
Автор

so does that mean no more delay? So many bart delay on the news!

chibba
Автор

Only took them 35 years. No one should be cheering Bart. 😢😢😢

duotronic
Автор

I swear they already did this in the 2000s decade.

stevens
Автор

If the big one strikes while your in the tube, your a gonner.

a.l