TBM`s breakthrough at Dimotiko Theatro Station/Ο Μετροπόντικας στο Δημοτικό Θέατρo

preview_player
Показать описание
Athens`Metro Line 3 extension to Piraeus. The TBM entering the last station Dimotiko Theatro (Municipal Theatre). This extension is 7,5km long with 6 underground stations (Agia Barbara, Korydallos, Nikea, Maniatika, Piraeus (connection with Line 1), Dimotiko Theatro. It will be delivered in 2 phases. In 2019 the first 3 stations and by 2021 the 3 last stations.
Рекомендации по теме
visit shbcf.ru