Cement Injection Grouting Service | Available on IndiaMART

preview_player
Показать описание
Cement Injection Grouting Service

For more details click the link below:

Product Details:
Cement Injection Grouting Service
INJECTION PROCESS: Fully examine the existing site conditions to ensure that all associated work can be performed without removing or relocating existing utilities, structures or structural members. 1) Remove all standing water. 2) Drill at a 45˚ degree angle where possible to intersect the wall/floor joint interface halfway through the thickness of the substrate (e.g. 4” deep for 8” thick slab) 3) Drilling depth should be half the thickness of the concrete member. 4) Install mechanical injection ports and secure in place at a spacing of 6- 12” inches apart (6” for hairline and 12” for wider cracks). Alternate positioning from left side to right side as you move along the crack where possible. Extremely wide cracks (if any exist) should be covered with a surface seal prior to injection in order to contain the injection resin until cured. Under proper pumping 

Contact Details:
Anas
Ground Floor
House No. 59
F-Block
J J Colony
Bawana
New Delhi
Delhi
110039

Download IndiaMart app now.
Рекомендации по теме
join shbcf.ru