DILOG 9110 MFT 18th EDITION- Loop, Rcd & Ramp test sequence.

preview_player
Показать описание
This is a short video to give you an insight into the basic test sequence of the Dilog 9110, for those of you considering buying this mft.

Key Features
RCD-LOC XLT
Auto Start Loop & Continuity tests
Auto RCD Test with Ramp Test
500V Insulation test
UK’s largest colour LCD display
Optional Remote Probe (Item TLRP911x to be ordered separately)
Features
Loop Impedance – Unique auto start RCD-LOC XLT loop test principle will not trip any RCD
Prospective short circuit current – with auto start and direct readout of PSCC
High Current Loop Test – auto start loop test with high current Ze measurement
Continuity test – with auto start & null facility to zero out lead resistance
RCD testing – Trip time, trip current, auto test and ramp current
RCD auto test – test RCDs in auto mode and simply recall the test results once finished
Insulation measurement – with 250 & 500V test voltages
Integrated socket polarity test
Fully protected against damage when accidentally connected across phases
Рекомендации по теме
Комментарии
Автор

Another great video and thank you for taking the time out to create this live testing overview of our DL9110. We are very glad to hear you are enjoying testing with our Installation Tester.

DilogGroup
Автор

Whats your thoughts on that meter m8? Was thinking about getting it.

MrKwelsh