filmov
tv
Testing the SR 99 tunnel’s ventilation system

Показать описание
In August 2018, Seattle Tunnel Partners tested the SR 99 tunnel’s ventilation system. This videos shows one of the ventilation tests in progress. The ventilation system is just one of the many systems undergoing testing to make sure the SR 99 tunnel functions as designed. The new tunnel could open as soon as fall 2018.
Testing the SR 99 tunnel’s ventilation system
Testing fire systems inside the SR 99 tunnel
SR 99 tunnel safety tests
SR99 Tunnel unsafe for motorcycles? #motorcycle #seattle #roadsafety
What it will take to finish the Highway 99 Tunnel
A look at how the entrances and exits of the new SR 99 tunnel are laid out
SR 99 tunnel emergency response drill
First data from 99 tunnel tolling
SR 99 Tunnel machine on the move
SR 99 Tunnel Innovative Pipe Layout Solution - Shinn Mechanical
One Smart Tunnel
Final assembly of the double-deck highway in the SR 99 tunnel
First non-holiday of SR 99 tunnel tolling will gauge commuter usage
The first 'normal' Monday will be a test for the SR 99 tunnel
WSDOT believes it's identified cause of water leaking from SR 99 tunnel
Monitoring the ground and buildings during SR 99 tunnel construction
VIDEO: First weekday for tolls in SR 99 tunnel
Early 2019 set for opening of SR 99 tunnel
Keeping waterfront traffic moving during SR 99 tunnel construction
Proposed SR 99 Bored Tunnel Underground Simulation March 2010
Unearthing SR 99 tunnel ramps near Seattle's stadiums
SR 99 tunnel north access concrete placement
Water leaking from ceiling of Seattle's SR 99 tunnel onto southbound lanes
Hwy 99 Tunnel Drive through
Комментарии