Transportation Problem Optimal Solution with MODI and ZQ (Total Cost)

preview_player
Показать описание
Transportation Video 6 of 7
Example 2

Two examples of the Linear Programming Transportation Problem are given. The first is videos 1, 2, and 3. The second is videos 4, 5, and 6.
* The Least Cost Method (sometimes called the Low Cost Method or the Minimum Cost Method) is use to find the initial feasible solution. This method typically gets you closer to a solution than the Northwest Corner Method.
* The Stepping Stone Method is the second video in the series and is a good teaching tool to aid in the understanding of how to reach an optimal solution.
* The 3rd video in each Series is the MODI or Modified Distribution Method and is the best way to solve a Transportation Problem.

How to solve a transportation problem using the MODI (Modified Distribution) method and finding the optimal solution. The total shipping cost, ZQ, is calculated.

All rights reserved, copyright 2012 Ed Dansereau
Рекомендации по теме
Комментарии
Автор

In cell CE, I wrote 150 on board and should have been 50 (200-150 = 50). The calculation for ZQ is correct.
From To Cost Qty Sub Total
A D 6 150 900
A F 9 50 450
B E 7 200 1400
C F 12 150 1800
C E 10 50 500
Total 5050

Taking a guess at your sequence you numbers are cells AD + CF + BE + CE + AF. I agree with cells AD, CF, and AF. Cell BE has a cost of $7 per unit and CE has a cost of $10 per unit and not $12.

Thank you very much. I enjoy the intellectual exchange.

EdDansereau
Автор

In germany we call people like you "Ehrenmann"

driphard
Автор

For some reason that was more understandable than our MODI lesson in german :D
Thanks a lot! :)

exzellentz
Автор

So Amazing! Helped me through a rough study session. Great clear and relatable examples. Thanks so much.

ayannahwoods
Автор

I believe there are some errors. CORRECT ME IF I AM WRONG

Once you have calculated all the U and V, and you analyze that you should add more units in C-F (since = -1) . THEN IN C-E you need to ad 50 and NOT 150.
THIS AFFECTS THE FINAL MODI COST = 150x6 + 150x12 + 200x12 +50x12 +50x9 = 6050,
Therefore the TOTAL SAVINGS ARE 6050-5450= 600 $

riveroaguilar
Автор

I'm writing today, this has been more helpful to me, thanks

utukufunkombezi
Автор

So it is just like this? Why did my lecturer made a big deal out of it

ShEng
Автор

Yes, It appears I wrote the number incorrectly on the board but used the correct number (50 and 150) in calculating ZQ. I will correct in the coming weeks. Thank you. I cracked under pressure! LOL.

EdDansereau
Автор

I feel cell B to F should be blank and C to F should be 150. I dont know if i am correct.
Please guide. Just learning this.

shamsudeenakodu
Автор

But when you have more than one negative values in the NET EVAL do you create loops around all of them ?

robertkafulu
Автор

I will review and get back to you. Thank you for your input. Sorry for the delay, I have been away.

EdDansereau
Автор

The best explanation ever. so much thanks to you.

aimanameen
Автор

in this case there is only one minus @ C-F i.e (-1). how to do optimal solution if there two minus(-) values ?

ammarsaneej
Автор

Thanks
Please can you use Degeneracy ??

kelvinsaah
Автор

oh god thanks your lecture is so easy to understand

dzakybima
Автор

How do we determine where to take units from and how much units to take? Also, we have homework about this but one U value, specifically U3, ended up being negative. Is that allowed? Thank you!

lindzillao
Автор

Thank you so much for an easy to understand lecture.

robertcarricaburujr.
Автор

I do not understand when the evaluation. why the capacity exceeds the limit?

rto
Автор

THANK YOU VERY MUCH...NOW IT MAKES MORE SENSE. :-)

eglishenmaredi
Автор

Really nice, lets hope i remember all this for my test on Friday :D

niler