Static pile load test procedure 2023|| Vertical Pile load test kaise kare 2023

preview_player
Показать описание
In this session, we are discussing

What is a pile load test?

Why we do pile load tests?

Static load test Anchor pile

Process of Pile load test The following tests are important to conduct on Pile foundation:

1. Static Load Test (Initial Load Test) IS CODE 2911: Part 4

2. Dynamic Load Test IS CODE 2911: Part 4

3. Non-Destructive Integrity Test (Sonic Logging

Measurement Test)

IS CODE 14893: 2001

Why testing is important or required?

1. ensure for the safety and quality purpose

2. To revise the working drawings

3. For quality control and assurance.

Static Load Test: This test is to be performed on the

Test pile after 14 days or 28 days of completion of

concreting of a particular pile. This Hydraulic jack is

fitted with and mounted on the pile on which the

bearing plate will be get placed both at the top and

bottom of the hydraulic jack.

The test load which will be 2.5 times of Design safe

load will get impressed and get compressed upon the

bearing plate which is mounted on a Hydraulic jack

through Hydraulic Jack, The acting load will be

transferred to the pile, how much the displacement/

settlement will get visual with the device connected

through pressure gauge with pile through the wire.

This test is to be carried to find out the load-bearing

capacity of the pile. This procedure will be get

repeated multiple times until a desirable result is

achieved.

Less settlement means the pile is safe, which allows

going for regular pile work.

If high range settlement means to design and

specification of the pile should be changed and

testing will be repeated again.

Dynamic Load Test: This test is also to be performed on the Test pile after 14 days or 28 days of completion of concreting of a particular pile. In this test the dead load (kinematic )which will be 2.5 times of design safe load will be hanged through a hydraulic crane with rope at a certain measured calculated

height, later allow to free fall of dead load on the Test

pile and settlement will be get measured by the

device called PDA (Pile Deflection Analyser) through

which different graphs will be get noted through if

high deflection shows the settlement of pile is

maximum, the pile is not safe.

Deflection graphs show and signify the settlement of

the pile and the bearing capacity of the pile. Static and dynamic load test is to be carried out on test pile and Non-destructive integrity (Sonic Logging Test) is non-destructive to be carried out during the driven of the pile. Non-destructive integrity (Sonic Logging Test) signifies the internal performance of concrete in the

pile.

SONIC LOGGING MEASUREMENT TEST: Through this

test we identify whether the concreting in the pile is

proceeding smoothly or not, to ensure the diameter of the pile should not get disturbed through the depth of the pile. High ultrasonic frequency wire will get inserted in the boring hole which is in touch with 2-3 steel bars in the reinforcement case and during concreting transducer and receiver will activate in following to attached with the device which shows the actual performance and workability of concrete.

Your Queries:
Static pile load test procedure 2023
Vertical pile load test procedure 2023
pile load test arrangment
Pile load test kaise kare
Pile load test Jack fixing
pile foundation concrete chipping
Pile cut off level fixing
All about pile cut off level
Pile load test dial gauge fixing
pile load test settlement range

Thanks for watching
🙏🙏🙏🙏🙏🙏🙏🙏
#pileloadtest #loadtestofdmcpile #dmcpile #matpile #tmrborepile #staticloadtest