The Problem with Longest Path in Primavera P6 and how you can fix it

preview_player
Показать описание
Primavera P6's built-in Longest Path filter doesn't seem to show exactly what you want. Learn how you can get a Truer Longest Path in P6 with this tutorial.

-

~

TAGS:

project controls, project controls tools, project management, primavera p6, project controls software, primavera p6 application
Рекомендации по теме
Комментарии
Автор

very good. Yes, I was using this method without the logic behind it you were describing

masooddoost
Автор

this is very useful for me, thank a lot, always waiting and following your channel. thank you

UjangSonjaya
Автор

My critical path is not show in bar chat, there is no any critical path but before that one is show please advice how to fix it

ksiddique
Автор

Why sometimes some activities that are already completed shows in the FP analysis?

warrensaplot
Автор

To show overlapping we have to show Longest Path Noth Float Path

LEARNPROJECTMANAGEMENT
Автор

Using progress override, it is possible to get an real critical path? Not longer I talking about critical by total float.

zacksanchez
Автор

Hi, Do you have videos for Revising the schedule that have already actual % and mhrs on which the EV = PV so that after revising the schedule on update it will have the same schedule % or the end % equals to 100%. As of the actual update becomes the plan schedule which is the baseline.
Thanks for the videos by the way, I have learned a lot while following yours.

franciscojrlarita
Автор

What about when we have constraint milestones then how we can extract the longest path?

nitinnaik
Автор

I have created a schedule and already I have negative float and longest path with FF relationship. I don’t have an option to change the FF to FS please help

mantlwanaletty
Автор

Dear all I have problem with updating my schedule Please guide me which way you used and which is the best way for updating schedule

parwezqasimy
Автор

Why don't show overlaping activities if are a critical activites as well ? Thanks.

mafumet