Brickwork peeling (Week 13 misc demolition clip)

preview_player
Показать описание
Shots of brickwork being peeled off the face of the front building. Apparently the black stuff underneath the bricks was bad stuff, as they spent a lot of time and effort scraping it all off.

From the week of February 3, 2014.

This former luxury hotel opened in 1960 and has occupied this city block for 54 years. When it opened it was considered one of the most luxurious hotels in the city, although it was criticized by many who considered its modern architecture to be ugly. (Note that it was painted very differently in those first years.)

It was advertised as San Francisco's "first hotel with air conditioning." During the Cold War, guests were assured the hotel had "a centrally controlled air raid warning system." It had a rooftop skating rink, an outdoor heated pool, wedding chapel and underground parking for 500 cars.

It closed October 30, 2009 and is being demolished to make way for construction of a new hospital.
Рекомендации по теме
Комментарии
Автор

Shots of brickwork being peeled off the face of the front building.  Apparently the black stuff underneath the bricks was bad stuff, as they spent a lot of time and effort scraping it all off.  From the week of February 3, 2014.

#demolition #sanfrancisco  

HotelDemolition
Автор

What are they spraying (water?) and why are they spraying it?

NotedDown
Автор

Wat was the black stuff under the red bricks ?

andreeputra
Автор

A wrecking ball would have been faster and more effective here.

andyhughes
welcome to shbcf.ru