filmov
tv
Μυκόνου Κυκλάδων Πωλείται Οικόπεδο 72000 τ.μ

Показать описание
It covers an area of 72.000m2 and is consisted in two parts 21,000m2 + 51.000m2 which are separated from the provincial road Mykonos - KALAFATIS.
It has an amphitheater view and each point of the plot has unobstructed sea view.
The offered plots are in the blue area, area (2.1a.1) 5 of spatial study of the county of Mykonos, according to the Presidential Decree 7.3.2005, GG 243 / 8.3.2005.
As land uses are permitted:
Residential - tourist facilities A and AA class - shops - bars, restaurants, clubs - leisure - public meeting places, cultural functions, agricultural warehouses, water facilities and reservoirs.
With building factor at 0.15 for tourist facilities ie 72.000 x 0,15 = 10.800m2, for independent houses 200m2 per 4 acres. With maximum height of structure 7.5 meters that will be consisted by 2 floors. There is an opportunity of combination with adjacent plots for a greater area.
As reference the licensing of construction:
For detached houses per 4 acres required period of about three months.
For hotel - conference center - holiday villas, the required time authorization period is about 6-8 months.
It has an amphitheater view and each point of the plot has unobstructed sea view.
The offered plots are in the blue area, area (2.1a.1) 5 of spatial study of the county of Mykonos, according to the Presidential Decree 7.3.2005, GG 243 / 8.3.2005.
As land uses are permitted:
Residential - tourist facilities A and AA class - shops - bars, restaurants, clubs - leisure - public meeting places, cultural functions, agricultural warehouses, water facilities and reservoirs.
With building factor at 0.15 for tourist facilities ie 72.000 x 0,15 = 10.800m2, for independent houses 200m2 per 4 acres. With maximum height of structure 7.5 meters that will be consisted by 2 floors. There is an opportunity of combination with adjacent plots for a greater area.
As reference the licensing of construction:
For detached houses per 4 acres required period of about three months.
For hotel - conference center - holiday villas, the required time authorization period is about 6-8 months.