filmov
tv
Kitchen Remodel: Part 14 - Final Wrap Up

Показать описание
Instead of waiting until every last end is tied up on the kitchen project, I decided I would show it off and do a final wrap up. I figured if I waited until every last thing was done, I would never get to this video. I have done many "before and after" video shots of the kitchen to help give a sense of the kitchen remodel. Although the functions of the kitchen are all in the same locations, the transformation is dramatic
Costs
Plumbing
$766.85
$131
Plumbing supply (est)
sink $607.39
fawcett $555
disposal $200
Appliances
dishwasher $999
range $6,104
blower $799
hood $2199
refrig $2,099.97
Bamboo
Bamboo Revolution $1,055
Countertops
3cm Stone Inc $3,760
Hardware
NBH pulls $134.4
slides $150
Outlet covers
Paint
SherwinWilliams $48.44
"Snowbound'
Wood
Crosscuts $194.46
$120.7
$204.6
$44.4
Home Depot (est)
$500
Total $19,854.3
The cost of this project using a contractor and not doing the work myself would be between $60k to $80k.
Costs
Plumbing
$766.85
$131
Plumbing supply (est)
sink $607.39
fawcett $555
disposal $200
Appliances
dishwasher $999
range $6,104
blower $799
hood $2199
refrig $2,099.97
Bamboo
Bamboo Revolution $1,055
Countertops
3cm Stone Inc $3,760
Hardware
NBH pulls $134.4
slides $150
Outlet covers
Paint
SherwinWilliams $48.44
"Snowbound'
Wood
Crosscuts $194.46
$120.7
$204.6
$44.4
Home Depot (est)
$500
Total $19,854.3
The cost of this project using a contractor and not doing the work myself would be between $60k to $80k.
Комментарии