500 IQ bridges in Poly Bridge 3!

preview_player
Показать описание

Part 43! Poly Bridge 3 (pb3) returns, continuing the secret world with the hardest ever levels!

LINKS!

Check out some more Poly Bridge videos here:

Epic Game Store Support-A-Creator Code: RCE

(In connection with Epic Games’ Support-A-Creator Program, I may receive a commission from certain in-game purchases)

#realcivilengineer #engineering #polybridge3
Рекомендации по теме
Комментарии
Автор

16:41 "I am not used to having a long one" - Matt

AaravBaranwal
Автор

23:23 you missed the fact that that huge cable muscle stopped the platform from rotating

jasonjazzz
Автор

No way any of these designs pass safety inspection.
A true hallmark of proper UK civil engineering

deptusmechanikus
Автор

10:45 I think that cheeky hydraulic was just there to go through the hydraulic phase. It wasn't attached to anything and seemed to give it time for the counterweight to do it's job.

thejwilliams
Автор

How is my submission subtle? You can clearly see the RCE on top

alanESV
Автор

7:56 adds rope muscle to the cable instead of replacing it. "It's more expensive!" 🤦

TheBaldrickk
Автор

The single small hydro in Thatman's replay isn't moving any thing. It is just used as a timer to determine how long the hydo phase will take.

thedrunkshinobi
Автор

13:30 that is genuinely the definition of a perfect backflip, wtf😂

RenneVangr
Автор

I have never played any polybridge, i just watch too much youtube but I think the hydraulic in Thatman level is there just for time. If there is no hydraulic maybe there is no hydraulic phase and the car just go directly; he just needs time for his mechanism to place the bridge.

hannibal
Автор

The hydraulic Bridges with no Hydraulics are always my favorite.😊

alext
Автор

My man has never heard of a parallelogram linkage

droppedpasta
Автор

5:45 "ENGINEERING TIME"
"I MEASURE SPANS AND I CALCULATE
SO MY BRIDGES WONT DISINTERGRATE
STAYING UP ALL NIGHT TO DESIGN A TRUSS
BEING SO COMFY IT WAS A MUST
SO I
*chorus*BRIDGED IN MY PANTS *chorus*
WHEN THERE'S STUFF TO DO AND YOU WORK FROM HOME (this line had a mistake in Matt's video song 5:55)
GOTTA REMOVE ALL CLOTHING ENGINEERING ALONE
WHEN THERES TOO MUCH WORK THE ONLY THING TO DO IS
*chorus* BRIDGE IN MY PANTS
ARCHITECTS DREAM
BUT I FOLLOW THROUGH
TURNING THEIR SKETCHES INTO SOMETHING TRUE
RATHER THAN DOING OVER TIME
ID RATHER GO HOME and then quit cuz i cant be dealing with this stuff anymore"

Mrnachocheese
Автор

0:43 no matt paddy surrounded by all of his friends. wait, does Paddy have friends?

Stellars
Автор

11:00
i talked with the fish, they liked your drainage work

jinenjipeke
Автор

OH! WOW! To be honest I don't usually like engineering songs in these videos but this one at 5:46 is quite good. I would actually add it to my play list not as a joke or a parody but as a really nice song :) And the ending of the song... it is so... natural... )))

nikolaymatveychuk
Автор

18:40 Changing the top bridge doesn't affect the bottom one, however, what it does do is affect the time the first car hits the flag, which in turn affects the time the second car starts.
Your first design for the bottom part was made for when the second car started at a different time in the replay, which is why it doesn't work now that the second car starts at a different time.

imdmn_
Автор

RCE & The Lonely Island Tour is something we need! 😅

tres
Автор

"Paddy in the back with all his.. female companions."

Oh Paddy, you dog! Oh... right..

BeastlyTT
Автор

15:46 " Not bad but not good." Iykyk

KathleenFeliciano
Автор

0:57 this explains a lot about the traffic flow in your cities (I am completely joking and I hope you and paddy both have an excellent day)

FQT_Keller-Ash