Concrete slab SETTING OUT. AS BUILT level survey. Information for the next level.

preview_player
Показать описание
In today's video we are jumping on the fresh poured slab. First we will do slab level survey and then we I will show you how to mark the slab to give all the information in the best way. Please subscribe to the channel and follow @SITENG on LinkedIn.
#CivilEngineer#Construction#SettingOut
Рекомендации по теме
Комментарии
Автор

great video! i didnt think about placing the hight of the slab on the instrument, so that i'll have only the difference. and i was just doing a survey of the slab, friday. Thanks for the tip. learned a lot from you. keep doing it!

AndreiMovanu
Автор

Greg... Thanks for the awesome video ... Very informative... Thanks again.

constructionmypassion
Автор

Thank you for the video
Can you do a video on preparing soil before laying interlocks Or cobble stones.. In landscape/roadways

sujithpayyanur
Автор

Hi Greg. Another great demonstration of your excellent work. I just wanted to ask if you can do a video on as-built levels for slab as you have done at the end of the video. How do you make the levels positive and negative in CAD. Thankyou .

amirtarakhail
Автор

Hi greg we are waiting for more vids from you pleaseeee. Plz teach us how to read soil reports, cube results and concrete mix designs.

khalidhashemi
Автор

please make a video how to cheak columne verticality by total station

KamranKhan-vlwj
Автор

Hello. Yeah for me it is better to mark columns at slab before the fixer will come.
Can you make some more focus to this nails, which are you marking point at concret?? Its look like small starts;-)

karolkaliszuk
Автор

hi there- really great video. Are they marking out for the column kickers here or will the entire column be poured? Also are the column kickers usually poured after the slab?

biggthadon
Автор

Hi Greg I am nearly a graduate engineer and on some of my drawings, the column concrete grade (C40/50) is larger than the slab concrete grade (C32/40). How do you deal with this joint on-site, I think you hinted at it in the video and I can see the wet concrete colour on the columns but I don't fully understand? Once you are pouring the slab are you supposed to infill around the columns with the higher grade concrete or just use the weaker concrete over the column?

gregorygeorgiou
Автор

Great video mate. How would you give levels for a slab that falls and rises?? Perfect vid very helpful

khalidhashemi
Автор

Greg are you using resection with retro stickers on the buildings to mark the floors?

stephenedwards
Автор

Great video. Greg with the SL asbuilt on the RC slab displayed, did you set the EDM to do the +/- tolerance measurement eg.+0.002 based on the design level etc during the survey or you did that on CAD?.

frankosei
Автор

Sir greg whats the meaning of 220 cm or meter?

olibertandres-rl
Автор

How do you spray the info on the concrete if it has been raining?

robuk
Автор

Hi Greg I am working as a projet engineer in dubai for the last 15 years I have experience working from setting out to final hand over of the project. Can you please suggest me whether I can apply for project engineer or I have to go from basic site engineer. I am a graduate engineer presently in dubai.

parandamareddy
Автор

i am interest in robotic total station/edm, please suggest where can i get the classes.

siddanthapusrinivas
Автор

hello sir ! please inform the RCC knowledge.

Sohail.editz_
Автор

Hi sir can i apply for a carpenter form works setting

olibertandres-rl
Автор

I must say those columns look small 🙊😁

basilagula
Автор

if you working in global you dont need reference line -

unda