Export and Import Primavera P6 Project with Baseline in XML Format | Multi projects in single file |

preview_player
Показать описание
#Softedemy,#PrimaveraP6,#Xml

A demonstration on how to import and export XML file in Primavera P6 Professional
Primavera P6 XML
There are two reasons specific to Primavera P6 that also make XML the preferred export format.

Using the XML format you are able to include baselines in your file export. XER files cannot include baselines.
The XML format also allows you to include Primavera Layout (PLF) Files in the export. PLF files store information on how data is presented in Primavera P6 layouts. PLF files are very useful for presenting and/or reporting scheduling information in your preferred format.
With all the benefits of the XML format, it does have one negative; it takes longer to load than XER format files. Still, that is a small price to pay and becomes less of an issue as the speed of computers continues to advance.

Summary
The XML format’s readability, versatility, and wide usage make it the preferred export format. The future is Primavera P6 XML files. It would therefore be good to make XML the standard format for your organization’s scheduling processes; especially if you are in a mixed environment of Primavera P6 Professional and P6 EPPM (web) systems.

It would also make sense to familiarize yourself with basic XML coding features just in case you ever wanted to go in there and make changes to any of the data records.

Export and Import Primavera P6 Project with Baseline in XML Format | Multiple projects in single file |

Time Stamps
0:00 Introduction to Topic
0:42​ Export Single Project with Baseline
01:52 Export Multi Projects with Baseline
03:41 Import Projects with Baseline
07:35 Closing Out of Video

Related Video Link
Export and Import Primavera P6 different formats | Cost Loading Method of Excel | Advanced Tutorial
Save print Settings | using Import and Export | Primavera P6 layout Files | Plf | Solutions | Tricks
How to Change Activity IDs by Export and Import | Primavera P6 Simple Easy and Fast Method | Tips |
Import Project Expense cost in Primavera P6 from Excel file | Load Expense in Project | load Actuals

Contact Details

Рекомендации по теме
Комментарии
Автор

0:00​ Introduction to Topic
0:42​​ Export Single Project with Baseline
01:52​ Export Multi Projects with Baseline
03:41​ Import Projects with Baseline
07:35​ Closing Out of Video

SoftEdemy