Pakistan railways, balochistan railway track blast, railway operation affected by terrorist attack*

preview_player
Показать описание
Pakistan railways, balochistan railway track blast, railway operation affected by terrorist attack*The terrorist attack on the railway bridge near Kolpur of Quetta division has disrupted the movement of trains and caused a lot of damage. The incident took place at 06:27 am, when a bridge was blown up, cutting the Quetta-Peshawar rail link.
According to Pakistan Railways, there were no trains in Quetta division at the time of the attack. However, several trains were halted or canceled as a precautionary measure.

Trains affected by the disruption include:
- Down pilot engine Quetta-Aab Gum
- 39-Dn (Jafar Express) Quetta
- Chaman Passenger (221-Up/222-Dn)
Coming from Karachi
3Aap Bolan mail stopped at Jacobabad.
Passengers will be refunded, and damages are being assessed. Fortunately, railway staff at nearby stations are said to be safe.
Рекомендации по теме