filmov
tv
Stillwater Bible Church Project- Stillwater, OK

Показать описание
Stillwater Bible Church
205 West 7th Avenue, Ste 101B
Stillwater, OK 74074
Project Details:
5-12 Age Play Structure- UPlay Boulder Point Play Structure in “Playful” color scheme for ages 5-12. Structure includes ADA Steps, (2) 6' Wave Slide, 4' Vine Climber, 6' Deluxe Rock Climb, 4’ Curve Slide, Bass Drum, RainWheel, Window Panel, Bongo Drums, Rung Climber and Crawl Tunnel
2-5 Age Play Center- Child Center 5 for ages 2-5. Center includes Car Panel, Window Panel, Shop Panel, Kid Roof, Single Right-turn Slide, Safety Panel, See Thru Panel, Single Straight Slide, Tic-Tac-Toe Panel, Fish Climber, Clock Panel, Flower Panel and Single Step
Independent Play Items- Pink Pony Spring Rider, Rockwell Teeter Duo in spring colors
Safety Surfacing- Thatch Turf
Amenities- Three benches and two regal style rectangle picnic tables
Project Timeline from Order to Install- 1 month
Supervised Installation in July 2015 by Noah’s Park & Playgrounds’ CPSI and approx. 8-10 Stillwater Baptist Church Volunteers
Project Total: $50,000 - $55,000
205 West 7th Avenue, Ste 101B
Stillwater, OK 74074
Project Details:
5-12 Age Play Structure- UPlay Boulder Point Play Structure in “Playful” color scheme for ages 5-12. Structure includes ADA Steps, (2) 6' Wave Slide, 4' Vine Climber, 6' Deluxe Rock Climb, 4’ Curve Slide, Bass Drum, RainWheel, Window Panel, Bongo Drums, Rung Climber and Crawl Tunnel
2-5 Age Play Center- Child Center 5 for ages 2-5. Center includes Car Panel, Window Panel, Shop Panel, Kid Roof, Single Right-turn Slide, Safety Panel, See Thru Panel, Single Straight Slide, Tic-Tac-Toe Panel, Fish Climber, Clock Panel, Flower Panel and Single Step
Independent Play Items- Pink Pony Spring Rider, Rockwell Teeter Duo in spring colors
Safety Surfacing- Thatch Turf
Amenities- Three benches and two regal style rectangle picnic tables
Project Timeline from Order to Install- 1 month
Supervised Installation in July 2015 by Noah’s Park & Playgrounds’ CPSI and approx. 8-10 Stillwater Baptist Church Volunteers
Project Total: $50,000 - $55,000