Installing 3 phase surge protection

preview_player
Показать описание
In this video im back on the KQ loadcenter Install and its time to fit the 3 phase surge protection.

If you enjoy electrical content please subscribe to the channel and checkout my links below 👇

M Y W E B S I T E ⚡

M Y L O A D O U T 🛠️

B I G B O O T S D I S C O U N T 🥾

U N I L I T E D I S C O U N T 🔦

J O I N T H E C H A N N E L 🤝

I N S T A G R A M 📷

T I K T O K ♪

The works carried out in the video and the opinions shared are my own, and not representative of the associates and companies in the video.

This content is purely for entertainment purposes and is in no way a "how to", tutorial or educational video.

Please consult an electrician when dealing with any electrical installations.

#electricianlife #electrical #electricalengineering
Рекомендации по теме
Комментарии
Автор

I'd terminate the SPD first and work the slack back to the breaker. I find it slightly easier 👌👍

Jay
Автор

Great video as always Mike. As an apprentice I definitely enjoy your videos the most, how much effort and pride/prep you put in your work is so nice too see. Also thank you for making these the amount I've learned of you is incredible so thank you.

dantheapprentice
Автор

I think the only thing I've disliked about that board compared to the isobar is the lack of extra din rail space next to the main switch for the spd to help keep that max distance down.

effervescence
Автор

Nice work, as usual. Always enjoy your videos. Thanks!

lowrybrock
Автор

Now you mention it, the vehicle entrance from that other video looks a lot like the contractor's entrance for QVC at that business park. If you are there, it's a site I did a bunch of work at, back a few years ago.

declannocher
Автор

Shouldn't the SPD be connected with a maximum of 50cm earth wiring?

extraspace
Автор

Do you have the switches to the middle of the board or to the outside of the board for on?

electricalstuff
Автор

One way to help keep SPD lengths within the maximum permitted 1 metre is with shorting length C (Earth) this can be done by connecting it to a local earth bar within the serperate SPD enclosure. Any length after this local earth bar is not counted towards length C.
Why I have no idea 🤔
However, it is a life saver when fitting 3-phase SPD's in a separate enclosure from the DB.

AGU-
Автор

Great video, Congrats on your wedding

Craigster
Автор

I just want to know does this spd protect the whole board

cheese
Автор

Is this a kit? I've only ever found the schneider SPDs on their own. The enclosure looks like its the MCG SPD kit?

richardparry
Автор

Does the spd cover the whole install how does that work pal if its just fed off its own breaker

ericthekingthekingtheking
Автор

Youd didnt much say about the cable sizing in to the spd from the mcb. Or breaker size and why..

Edgariux
Автор

That looks sooo far that SPD. I wouldnt be surprised if it was even over 1m of distance there. Really should have positioned it better!

peterigrenyi
Автор

Does the SPD not have to have very, very short leads… (within 0, 5 meter)..?

joopterwijn
Автор

That trunking is almost cheating 😂 We dont really use it in aus - not even sure if it's readily available. Might look into it its such a good finish 🤘

WillmannElectrical
Автор

Can I have stupid question? Why you haven't bond the surge protection box with rest of enclosures?

bodynek
Автор

During connection there is 110 v appearing in earth line

atharsabir
Автор

One note. The distance from the circuit breaker to the surge protector is too long, there are limitations in the installation instructions.

vadimstebeljak
Автор

I can’t stand the Schneider ct meter set up. Gets ridiculous when you have a 50mm 5core

tomorichard