SAP Engineering Change Management (ECM)

preview_player
Показать описание
SAP Engineering Change Management (ECM),Change Master,CC01
Рекомендации по теме
Комментарии
Автор

Thank you Yash.
Your videos are proving extreely useful to me.
Cheers

ohnotoyota
Автор

Very Good and knowledgeable video. Thanks for such an important teachings🙏

PradeepKumarSingh
Автор

informative and learnt new topic today with this video. thanks you

maheswarreddybathina
Автор

Thanks again for introductory video yash

alastormoody
Автор

Hi Yash, have you made video for making mandatory ECM number as you confirmed in video?

muhammadumair
Автор

Thanks alot, waiting for this topic 🙏

gopikrishnareddy
Автор

Thank you Yash, well explained about ECM. Can you also say about the method to find out the list of changes made on a BOM with Change control number for certain time period..
I am looking for kind of report transaction.

vinothkumar
Автор

how do you make the field for Change Number required for BOM change or Routing change? Is that an ABAP requeest?

uonair
Автор

I have one doubt, in one bom we used change numbers, but when we create production orders; it is still fetching old bom data; what could be the reason?

ronakm
Автор

Could you please explain ETO, ATO, MRP-Live, DD-MRP as well.

sureshkanna
Автор

In CC01, we have icons, Release Flag and Teco - did it required to be used during ECM

senthilmurugan
Автор

Hello yash your videos are always very informative with great learning.. but please change that introduction video it's very annoying...

balupatil
Автор

What's the T-Code to display all the ECN ?

aayushagarwal
Автор

sir, in bom we r able to track detailed changes but not in routing, is there any way to find changed history for routing. thanks a lot...

nk