New Warehouse Build Out Starts NOW!

preview_player
Показать описание
Huge hurdle cleared now that we have construction permits, we can go full steam ahead and get this warehouse up and running for June move in! Might not look like much now, but plans are to get this move in ready by June 10. Expect to see lots of progress over the weeks in the background on this. 1. Demo 2. Construction 3. Finishes 4. Move in.


An updated Amazon store with products I use.
om/shop/superspeedersrob

Vimeo Downloads and Rentals

Instagram - robferretti
Twitter - @robferretti
Рекомендации по теме
Комментарии
Автор

There’s a step up in that door. Pretty clear the floor is higher.

SkinnerFurniture
Автор

You didn’t notice the step in the door entrance?😨

winoNINE
Автор

what was with that weird flash at 4:59 with the number 2? something smells like spaghetti here

sSgtssprinkles
Автор

id make the door bigger while you're at this stage

Iave
Автор

I am so excited to see this warehouse being completed.. I always wanted to own a fleet of cars and like properly store them.

MelodyOo
Автор

The door step is an instant giveaway for your floor depth, what a great space inside for activities 😍

timmeh
Автор

Rob the type of guy to wear whitey tightees because they “get the job done” “they fit great”

ryanryan
Автор

That is going to be some building ✊I can’t wait to see the end result 😁

bigd
Автор

I say leave the cinder block pile, it adds character

ajames
Автор

Usually don't comment but Rob you are going to have a huge ponding problem at your door when you build that ramp. I'm certain you can cut the guardrail a few feet to give you a couple feet of clearance. Since you have high end customers I'd really take a look at that drainage at the door. Love a construction engineer

jamesduke
Автор

Silly Rob! :D You can see the door is a step up right next to this. :D

DrivingWithJake
Автор

Awesome I can’t wait to see the finished product

thebrock
Автор

since you started, i bought, demo'd got permits, built and rented out a 50 unit apt house in nyc. jus sayin

anothercar
Автор

The construction nightmares are just starting.

ozzstars_cars
Автор

4:59 Now a 2 flashed, that's the second video that I've seen done that. This is gonna lead to a rob arg (I kid, I kid).

Bobbydog
Автор

3 weeks is a pretty tight timeline imo. If you can get sizeable crews in there right now it could be done.

billybobjoe
Автор

If water is pouring out the side of the building that could be because your main roof drain is clogged and it's coming out of the over flow system. If you have plumbers on site you should ask them if they can just look to see if thats what is going on.

geirkselim
Автор

Today, Mr Spaghetti starts building his biggest pot of pasta sauce to store his expensive meatballs.

Good luck, Rob! I am looking forward to seeing how the new warehouse turns out!

briano
Автор

Nice, should be good when its done. June 1 is a bit ambitious, certainly would be here.

tdlaustralia
Автор

You didnt expect the floor being that high...i see... did you by any chance notice the MASIVE step up in the door to the left of the hole in wall!!! Lol ;)

tylerwildman